Piping
8.3Dehydration/Leak Test and Charging Procedures for
8.3.1
The Fan Speed Control system uses a pressure activated electronic fan speed control system and remotely located thermostat(s) to ensure operation at ambient temperatures as low as 0°F
Fan Speed Control Piping
Two discharge lines and two liquid lines must be
Fan Speed Control Materials Supplied
•
•
•Piping access cover to be reinstalled when piping is complete
•
•Terminal block for
•Condenser
Fan Speed Control Leak Check and Evacuation Procedure
Proper leak check and evacuation can be accomplished only with all system solenoid valves open and check valves accounted for.
NOTE
Systems with scroll or digital scroll compressors include a
1.If unit power is available, open the unit liquid line solenoid valves using the evacuation function for System #1 and System #2 in the diagnostic section of the iCOM control (refer to the iCOM user manual,
2.For
3.For scroll and digital scroll compressors, connect refrigerant gauges to the suction rotalock valves and discharge line Schrader valves (see Note above) on both compressors.
4.Starting with Circuit #1, open the service valves and place a 150 PSIG (1034 kPa) of dry nitrogen with a tracer of refrigerant. Check system for leaks with a suitable leak detector.
5.With pressure still in Circuit #1, open the compressor service valves in Circuit #2. If pressure increases in Circuit #2, the system is
6.After completion of leak testing, release the test pressure (per local code) and pull an initial deep vacuum on the system with a suitable pump.
7.After four hours, check the pressure readings and, if they have not changed, break vacuum with dry nitrogen. Pull a second
78