Piping Schematics

Figure 72 Primary connection locations—downflow, air-cooled, 105kW (30 ton), all compressor models

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

A

 

 

 

 

 

 

A

All dimensions

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Front View

 

 

 

Note: Drawing not to scale

 

 

 

 

 

 

Tolerance on all

 

 

 

 

 

 

from rear corner

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

of unit including

 

 

 

piping dimensions

 

 

 

 

 

 

 

 

 

Section A-A

 

 

 

panels

X

 

 

 

is ± 1/2" (13mm)

 

 

 

 

O

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

4" (102mm)

 

15-11/16"

Blower

G1G2 R (398mm)

Outlet

L1 L2

 

B3

 

 

16-7/16"

ECS ECR

 

(418mm)

 

CD

 

 

Blower

Outlet

B2

Blower

Outlet

B1

LV1

LV2

LV3

Y

35"

(889mm)

HUM E1 E2 Front of Unit

131"

(3327mm)

DPN001014

Rev. 2

 

 

X

 

Y

Connection Size / Opening

Point)

Description)

inches (mm)

inches (mm)

inches (mm)

 

 

 

 

 

R

Refrigerant Access

109 (2769)

15-3/4 (400)

16-7/16 x 4 (418 x 102)

L1

Liquid Line System 1

121-3/4

(3092)

16-3/4 (425)

5/8 Cu Sweat

 

 

 

 

 

L2

Liquid Line System 2

118-1/8 (3000)

16-3/4 (425)

5/8 Cu Sweat

 

 

 

 

 

G1

Hot Gas Discharge 1

118-1/4 (3004)

14-1/4 (362)

1-1/8 Cu Sweat

G2

Hot Gas Discharge 2

115-5/8 (2937)

14-1/4 (362)

1-1/8 Cu Sweat

 

 

 

 

 

CD

Condensate Drain *

83-13/16 (2129)

30 (762)

3/4 FPT

 

 

 

 

 

W/ Optional Pump

83-13/16 (2129)

30 (762)

1/2 Cu Sweat

 

HUM

Humidifier Supply Line

102-3/4

(2610)

31-3/4 (806)

1/4 Cu Sweat

 

 

 

 

 

 

ECS**

Econ-O-Coil Supply

101-7/8

(2588)

29 (737)

2-5/8 Cu Sweat

 

 

 

 

 

 

ECR**

Econ-O-Coil Return

94-9/16

(2402)

29 (737)

2-5/8 Cu Sweat

HS

Hot Water Reheat Supply

 

 

Consult Factory

 

 

 

 

 

HR

Hot Water Reheat Return

 

 

Consult Factory

 

 

 

 

 

E1

Electrical Connection (High Volt)

98-1/8 (2492)

31-1/4 (794)

2-1/2

E2

Electrical Connection (High Volt)

91 (2311)

31-1/4 (794)

2-1/2

 

 

 

 

 

LV1

Electrical Connection (Low Volt)

2 (51)

28-1/4 (718)

7/8

 

 

 

 

 

LV2

Electrical Connection (Low Volt)

2 (51)

30-1/4 (768)

7/8

LV3

Electrical Connection (Low Volt)

2 (51)

32 (813)

7/8

 

 

 

 

 

 

B1

Blower Outlet

27-7/8

(708)

18 (457)

14-1/2 x 15-11/16 (368 x 398)

 

 

 

 

 

 

B2

Blower Outlet

52-1/16

(1322)

18 (457)

14-1/2 x 15-11/16 (368 x 398)

B3

Blower Outlet

76-1/4 (1937)

18 (457)

14-1/2 x 15-11/16 (368 x 398)

 

 

 

 

 

 

*Field-pitch condensate drain line a minimum of 1/8" (3.2 mm) per foot (305 mm). All units contain a factory installed condensate trap. Do not trap external to the unit. Drain line may contain boiling water. Select appropriate drain system materials. The drain line must comply with all local codes.

**Supplied on Dual-Cool systems only (4-pipe system).

97

Page 107
Image 107
Liebert DS user manual HUM E1 E2 Front of Unit