FRONT SECTION VIEW

Piping Schematics

Figure 75 Primary connection locations—upflow, air-Cooled, 28-42kW (8-12 ton), semi-hermetic compressor models

 

 

 

 

 

 

 

All dimensions from

 

 

 

 

10-1/8"

 

 

rear corner of unit

 

O

NOTES:

 

 

 

 

including panels

X

 

(257mm)

 

 

1. Drawing not to scale.

 

 

 

 

 

 

 

 

 

 

ECR

 

 

 

 

2. Tolerance on all piping dimensions

4-1/8" (105mm)

 

3.

R1

 

 

 

 

is ±1/2" (13mm).

 

ECS

 

BLOWER

 

 

3. Field-routed alternatives for refrigerant

 

 

 

 

HUM

 

 

 

gas and liquid line connection points.

 

 

 

 

CPD

 

OUTLET

 

 

4. See submittal page DPN001120 for

 

 

 

R2

 

 

4.

 

 

blower outlet and deck dimensional data.

4"

 

 

 

 

 

 

L1

L2 G1 G2

 

 

 

 

 

 

 

 

 

 

35"

(102mm)

 

 

 

 

 

 

 

Y

 

11-13/16"

 

 

 

 

 

(889mm)

 

 

 

 

 

 

3.

(300mm)

 

 

 

 

 

 

 

 

 

 

 

 

LV1

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E1

E2

 

LV2

 

 

 

 

 

 

 

LV3

 

 

 

 

 

 

 

 

73"

 

 

 

 

 

 

 

 

 

(1854mm)

 

FRONT

TOP VIEW

6"

 

(152mm)

R3

17-3/16"

3.

(437mm)

 

 

CGD*

3-7/8"

14-1/4"

(98mm)

(362mm)

 

15-7/8"

 

(403mm)

LEFT SIDE SECTION VIEW

17-1/16"

L1 L2 G1

G2

 

(434mm)

 

 

 

 

CGD*

FACTORY LOCATION

 

 

 

FRONT SECTION VIEW

DPN001119

Rev. 1

(LEFT FRONT PANEL NOT SHOWN)

 

 

X

Y

Connection Size / Opening

Point

Description

inches (mm)

inches (mm)

inches (mm)

 

 

 

 

 

R1 3

Refrigerant Access (Top)

60-5/8 (1539)

2-13/16 (71)

10-1/8 x 4-1/8 (257 x 105)

 

 

 

 

 

R2 3

Refrigerant Access (Bottom)

63 (1600)

13-13/16 (351)

16-7/16 x 4 (418 x 102)

 

 

 

 

 

L1

Liquid Line System 1

79-3/16 (2011)

16-3/4 (425)

1/2 Cu Sweat

 

 

 

 

 

L2

Liquid Line System 2

76-1/2 (1943)

16-3/4 (425)

1/2 Cu Sweat

 

 

 

 

 

G1

Hot Gas Discharge 1

73-7/8 (1876)

16-5/8 (422)

5/8 Cu Sweat

 

 

 

 

 

G2

Hot Gas Discharge 2

70-1/8 (1780)

16-5/8 (422)

5/8 Cu Sweat

 

 

 

 

 

R3 3

Refrigerant Access (Side)

-

-

6 x 17-3/16 (152 x 437)

 

 

 

 

 

CGD*

Condensate Gravity Drain

-

-

3/4 FPT

 

 

 

 

 

CPD

Condensate Pump Discharge (Opt)

56-1/4 (1429)

11-1/8 (283)

1/2 Cu Sweat

 

 

 

 

 

HUM

Humidifier Supply Line

56-1/4 (1429)

9-1/8 (233)

1/4 Cu Sweat

 

 

 

 

 

ECS**

Econ-O-Coil Supply

56 (1423)

7-5/16 (186)

1-5/8 Cu Sweat

 

 

 

 

 

ECR**

Econ-O-Coil Return

56 (1423)

4-1/2 (114)

1-5/8 Cu Sweat

 

 

 

 

 

E1

Electrical Connection (High Voltage)

52-3/8 (1330)

30 (762)

2-1/2

 

 

 

 

 

E2

Electrical Connection (High Voltage)

46-7/8 (1191)

30 (762)

2-1/2

 

 

 

 

 

LV1

Electrical Connection (Low Voltage)

19-1/2 (495)

29-1/16 (738)

7/8

 

 

 

 

 

LV2

Electrical Connection (Low Voltage)

19-1/2 (495)

30-1/2 (775)

7/8

 

 

 

 

 

LV3

Electrical Connection (Low Voltage)

19-1/2 (495)

31-15/16 (811)

7/8

 

 

 

 

 

*Field-pitch condensate drain line a minimum of 1/8" (3.2 mm) per foot (305 mm). All units contain a factory installed condensate trap. Do not trap external to the unit. Drain line may contain boiling water. Select appropriate drain system materials. The drain line must comply with all local codes.