Figure 81 Primary connection locations—upflow, water/glycol/GLYCOOL, 105kW (30 ton), all

Piping Schematics

Figure 81 Primary connection locations—upflow, water/glycol/GLYCOOL, 105kW (30 ton), all

All dimensions from rear corner of unit including panels

 

 

Blower

Blower

Blower

 

35"

8"

Outlet

Outlet

Outlet

 

(203mm)

 

 

 

 

 

(889mm)

 

 

 

 

 

 

2-7/8"

 

 

 

 

 

NOTES:

(73mm)

 

 

LV1

LV3

 

3-1/2"

 

 

 

 

 

 

 

 

1. Drawing not to scale.

(89mm)

 

 

LV2

LV4

2. Tolerance on all piping dimensions

 

 

132"

 

 

 

is ± 1/2" (13mm).

 

 

 

 

 

3. Field routed alternatives for water/glycol

 

 

(3353mm)

 

 

Front Of Unit

connections.

 

 

 

 

 

 

4. See submittal page DPN001192 for

 

 

 

 

 

 

blower outlet and deck dimensional data.

 

 

 

 

 

6"

(152mm)

17-3/16" (437mm)

W3

WS

WR

Manual background CGD*

TOP VIEW OF UNIT

3-7/8"

 

 

14-1/4"

 

 

CGD*

 

 

 

 

 

 

 

 

 

 

(98mm)

 

 

 

 

 

 

 

 

 

 

 

FRONT SECTION VIEW OF UNIT

 

 

 

(362mm)

 

 

 

15-7/8"

 

 

 

(Left Front Panel Not Shown)

 

 

 

 

(403mm)

 

 

 

DPN001258

LEFT SIDE SECTION VIEW OF UNIT

 

 

 

Rev. 0

Table 52 Piping data—upflow, upflow, water/glycol/GLYCOOL, 105kW (30 ton), all

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

X

Y

 

Connection Size /

Point

 

 

Description

inches (mm)

inches (mm)

 

Opening, inches (mm)

W1 3

Water/Glycol/GLYCOOL Access (Bottom)

126-1/8 (3204)

9 (229)

 

3-1/2 x 8 (89 x 203)

 

 

 

 

 

 

 

 

 

 

W2 3

Water/Glycol/GLYCOOL Access (Top)

126-1/8 (3204)

9 (229)

 

3-1/2 x 8 (89 x 203)

 

 

 

 

 

 

 

 

 

 

W3 3

Water/Glycol/GLYCOOL Access (Side)

-

-

 

6 x 17-3/16 (152 x 437)

 

 

 

 

 

 

 

 

 

 

WS 3

Water/Glycol/GLYCOOL Supply

-

-

 

2-1/8 Cu Sweat

 

 

 

 

 

 

 

 

 

 

WR 3

Water/Glycol/GLYCOOL Return

-

-

 

2-1/8 Cu Sweat

 

 

 

 

 

 

 

 

 

 

CGD*

Condensate Gravity Drain

-

-

 

3/4 FPT

 

 

 

 

 

 

 

 

 

 

CPD

Condensate Pump Discharge (Opt)

102-3/8 (2600)

13-5/8 (346)

 

1/2 Cu Sweat

 

 

 

 

 

 

 

 

 

 

HUM

Humidifier Supply Line

101-1/8 (2569)

13-1/8 (333)

 

1/4 Cu Sweat

 

 

 

 

 

 

 

 

 

 

ECS

Econ-O-Coil Supply

101-1/8 (2569)

10-1/4 (260)

 

2-5/8 Cu Sweat

 

 

 

 

 

 

 

 

 

 

ECR

Econ-O-Coil Return

101-1/8 (2569)

5-1/4 (133)

 

2-5/8 Cu Sweat

 

 

 

 

 

 

 

 

 

 

E1

Electrical Conn. (High Volt)

98-1/2 (2502)

30 (762)

 

2-1/2

 

 

 

 

 

 

 

 

 

 

E2

Electrical Conn. (High Volt)

93 (2362)

30 (762)

 

2-1/2

 

 

 

 

 

 

 

 

 

 

LV1

Electrical Conn. (Low Volt)

41-1/8 (1045)

30-3/8 (772)

 

7/8

 

 

 

 

 

 

 

 

 

 

LV2

Electrical Conn. (Low Volt)

38-7/8 (987)

30-3/8 (772)

 

7/8

 

 

 

 

 

 

 

 

 

 

LV3

Electrical Conn. (Low Volt)

35-1/8 (892)

30-3/8 (772)

 

7/8

 

 

 

 

 

 

 

 

 

 

LV4

Electrical Conn. (Low Volt)

31-5/8 (803)

30-3/8 (772)

 

7/8

 

 

 

 

 

 

 

 

 

 

*Field pitch condensate drain line a minimum of 1/8" (3.2 mm) per foot (305 mm). All units contain a factory-installed condensate trap. Do not trap external to the unit. Drain line may contain boiling water. Select appropriate drain system materials. The drain line must comply with all local codes.

106

Page 116
Image 116
Liebert DS user manual Primary connection locations-upflow, water/glycol/GLYCOOL, 105kW 30 ton, all