Piping Schematics

Figure 80 Primary connection locations—upflow, air-cooled, 105kW (30 ton), all

15-3/16"

35" (386mm) (889mm)

4"

NOTES:(102mm)

1. Drawing not to scale.

2. Tolerance on all piping dimensions

22-1/2"

(572mm)

R2

16-7/16" (418mm)

 

 

All dimensions from

 

 

 

rear corner of unit

X

 

 

including panels

 

 

 

ECR

Blower

Blower

Blower

 

ECS

 

HUM

Outlet

Outlet

Outlet

 

CPD

 

 

 

 

LV1 LV3

 

E1

E2

 

LV2 LV4

O

Y

 

is ± 1/2" (13mm).

3.

Field routed alternatives for refrigerant

 

gas and liquid line connection points.

4.

See submittal page DPN001192 for

 

blower outlet and deck dimensional data.

132"

 

(3353mm)

Front Of Unit

 

6"

(152mm)

R3

17-3/16" (437mm)

CGD*

3-7/8" 14-1/4"

(98mm) (362mm) 15-7/8" (403mm)

TOP VIEW OF UNIT

20-1/16" L1 L2G1 G2 (509mm)

CGD*

Factory Location

LEFT SIDE SECTION VIEW OF UNIT

 

FRONT SECTION VIEW OF UNIT

DPN001257

 

 

(Left Front Panel Not Shown)

 

Rev. 0

 

 

 

 

 

 

 

 

 

Table 51 Piping data—upflow, air-cooled 105kW (30 ton), all

 

 

 

 

 

 

 

 

 

 

 

 

 

Point

Description

 

X

 

Y

 

 

Connection Size / Opening

 

 

 

 

 

 

 

 

R1 3

Refrigerant Access (Top)

 

106-7/8 (2715)

1-7/8

(48)

 

22-1/2 x 15-3/16 (572 x 386)

 

 

 

 

 

 

 

 

 

R2 3

Refrigerant Access (Bottom)

 

109-1/8

(2772)

13-7/8

(352)

 

16-7/16 x 4 (418 x 102)

 

 

 

 

 

 

 

 

 

 

L1

Liquid Line System 1

 

121-3/4

(3092)

16-3/4

(425)

 

 

5/8 Cu Sweat

 

 

 

 

 

 

 

 

 

 

L2

Liquid Line System 2

 

118-1/8

(3000)

16-3/4

(425)

 

 

5/8 Cu Sweat

 

 

 

 

 

 

 

 

 

G1

Hot Gas Discharge 1

 

118-1/4

(3004)

14-1/4

(362)

 

1-1/8 Cu Sweat

 

 

 

 

 

 

 

 

 

G2

Hot Gas Discharge 2

 

115-5/8

(2937)

14-1/4

(362)

 

1-1/8 Cu Sweat

 

 

 

 

 

 

 

 

 

R3 3

Refrigerant Access (Side)

 

-

 

-

 

 

6 x 17-3/16 (152 x 437)

 

 

 

 

 

 

 

 

 

 

CGD*

Condensate Gravity Drain

 

-

 

-

 

 

 

3/4 FPT

 

 

 

 

 

 

 

 

 

 

CPD

Condensate Pump Discharge (Opt)

 

102-3/8

(2600)

13-5/8

(346)

 

 

1/2 Cu Sweat

 

 

 

 

 

 

 

 

HUM

Humidifier Supply Line

 

101-1/8 (2569)

13-1/8 (333)

 

 

1/4 Cu Sweat

 

 

 

 

 

 

 

 

 

ECS

Econ-O-Coil Supply

 

101-1/8

(2569)

10-1/4

(260)

 

2-5/8 Cu Sweat

 

 

 

 

 

 

 

 

ECR

Econ-O-Coil Return

 

101-1/8

(2569)

5-1/4 (133)

 

2-5/8 Cu Sweat

 

 

 

 

 

 

 

 

E1

Electrical Conn. (High Volt)

 

98-1/2 (2502)

30 (762)

 

 

2-1/2

 

 

 

 

 

 

 

 

E2

Electrical Conn. (High Volt)

 

93 (2362)

30 (762)

 

 

2-1/2

 

 

 

 

 

 

 

 

 

LV1

Electrical Conn. (Low Volt)

 

41-1/8 (1045)

30-3/8

(772)

 

 

7/8

 

 

 

 

 

 

 

 

 

 

LV2

Electrical Conn. (Low Volt)

 

38-7/8

(987)

30-3/8

(772)

 

 

7/8

 

 

 

 

 

 

 

 

 

 

LV3

Electrical Conn. (Low Volt)

 

35-1/8

(892)

30-3/8

(772)

 

 

7/8

 

 

 

 

 

 

 

 

 

 

LV4

Electrical Conn. (Low Volt)

 

31-5/8

(803)

30-3/8

(772)

 

 

7/8

 

 

 

 

 

 

 

 

 

 

*Field pitch condensate drain line a minimum of 1/8" (3.2 mm) per foot (305 mm). All units contain a factory-installed condensate trap. Do not trap external to the unit. Drain line may contain boiling water. Select appropriate drain system materials. The drain line must comply with all local codes.

105

Page 115
Image 115
Liebert DS user manual Piping data-upflow, air-cooled 105kW 30 ton, all, Point Description Connection Size / Opening