Figure 76 Primary connection locations—upflow, water/glycol/GLYCOOL, 28-42kW (8-12 ton), all compressor models

NOTES:

 

 

1. Drawing not to scale.

All dimensions

 

2. Tolerance on all piping dimensions is ± 1/2" (13mm).

 

3.

Field-routed alternatives for water/glycol connections.

from rear corner

 

4.

See submittal page DPN001120 for blower outlet

of unit including

X

 

and deck dimensional data.

panels

 

 

0

35" 8" (889mm) (203mm)

3-1/2"

(89mm)

W1,W2

3

2-7/8"

(73mm)

ECS

Blower

ECR

HUM

Outlet

CPD

4

 

LV1

E1 E2

LV2

LV3

Y

6"

 

(152mm)

W3

 

17-3/16"

WS

WR

(437mm)

3

 

CGD*

3-7/8"Top View of Unit 14-1/4"

(98mm) Front Section View(362mm)

in. (mm) 15-7/8"Manual background (403mm)

Left Side Section View

86"

 

(2184mm)

Front

Top View of Unit

 

CGD*

Front Section View

 

 

 

 

(Left Front Panel Not Shown)

DPN001179

 

 

Rev. 2

 

 

X

Y

Connection Size / Opening

Point

Description

in. (mm)

in. (mm)

in. (mm)

 

 

 

 

 

W1 3

Water/Glycol/GLYCOOL Access (Bottom)

79-15/16 (2030)

9 (229)

3-1/2 x 8 (89 x 203)

 

 

 

 

 

W2 3

Water/Glycol/GLYCOOL Access (Top)

79-15/16 (2030)

9 (229)

3-1/2 x 8 (89 x 203)

W3 3

Water/Glycol/GLYCOOL Access (Side)

6 x 17-3/16 (152 x 437)

 

 

 

 

 

WS 3

Water/Glycol/GLYCOOL Supply

1-5/8 Cu Sweat

 

 

 

 

 

WR 3

Water/Glycol/GLYCOOL Return

1-5/8 Cu Sweat

CGD

Condensate Gravity Drain

3/4 FPT

 

 

 

 

 

CPD

Condensate Pump Discharge (Opt)

56-1/4 (1429)

11-1/8 (282)

1/2 Cu Sweat

 

 

 

 

 

HUM

Humidifier Supply Line

56-1/4 (1429)

9-1/8 (232)

1/4 Cu Sweat

ECS**

Econ-O-Coil Supply

56 (1423)

7-5/16 (186)

1-5/8 Cu Sweat

 

 

 

 

 

ECR**

Econ-O-Coil Return

56 (1423)

4-1/2 (114)

1-5/8 Cu Sweat

 

 

 

 

 

E1

Electrical Connection (High Voltage)

52-3/8 (1330)

30 (762)

2-1/2

E2

Electrical Connection (High Voltage)

46-7/8 (1191)

30 (762)

2-1/2

 

 

 

 

 

LV1

Electrical Connection (Low Voltage)

19-1/2 (495)

29-1/16 (738)

7/8

 

 

 

 

 

LV2

Electrical Connection (Low Voltage)

19-1/2 (495)

30-1/2 (775)

7/8

LV3

Electrical Connection (Low Voltage)

19-1/2 (495)

31-15/16 (811)

7/8

 

 

 

 

 

*Field-pitch condensate drain line a minimum of 1/8" (3.2 mm) per foot (305 mm). All units contain a factory installed condensate trap. Do not trap external to the unit. Drain line may contain boiling water. Select appropriate drain system materials. The drain line must comply with all local codes.