Liebert DS Top View Of Unit, Front Section View Of Unit, Left Front Panel Not Shown, Point

Models: DS

1 136
Download 136 pages 14.39 Kb
Page 112
Image 112
TOP VIEW OF UNIT
DPN001212 Rev. 2

Piping Schematics

Figure 77 Primary connection locations—upflow, air-cooled, 53-77kW (15-22 ton), semi-hermetic compressor models

 

 

 

22-1/2"

All dimensions from

X

 

 

 

rear corner of unit

 

 

 

(572mm)

 

 

 

including panels

 

 

 

 

 

 

NOTES:

 

15-3/16"

Blower

Blower

 

1. Drawing not to scale.

 

Outlet

Outlet

 

2. Tolerance on all piping dimensions

35" (386mm)

 

 

 

is ± 1/2" (13mm).

 

(889mm)

 

 

 

 

4"

 

 

 

3. Field routed alternatives for refrigerant

16-7/16"

 

 

(102mm)

 

 

gas and liquid line connection points.

 

 

 

(418mm)

 

 

4. See submittal page DPN001191 for

 

 

 

 

blower outlet and deck dimensional data.

 

 

 

 

 

 

109" (2769mm)

Front of Unit

 

 

 

TOP VIEW OF UNIT

6"

 

 

 

 

 

 

 

 

(152mm)

 

 

 

 

 

17-3/16"

 

20-1/16"

 

 

 

(437mm)

 

(509mm)

 

 

 

3-7/8"

14-1/4"

 

 

 

 

(362mm)

 

Factory Location

 

(98mm)

 

 

15-7/8"

 

FRONT SECTION VIEW OF UNIT

 

 

 

(403mm)

 

(Left Front Panel Not Shown)

LEFT SIDE SECTION VIEW OF UNIT

 

 

 

O

Y

*Field pitch Condensate Drain line a minimum of 1/8" (3.2 mm) per foot (305 mm). All units contain a factory installed condensate trap. Do not trap external to the unit. Drain line may contain boiling water. Select appropriate drain system materials. The drain line must

comply with all local codes.

** Supplied on Dual Cooling Systems only

 

 

X

 

Y

 

Connection Size / Opening

Point

Description

inches (mm)

inches (mm)

inches (mm)

 

 

 

 

 

 

R1 3

Refrigerant Access (Top)

83-3/4 (2127)

1-7/8

(48)

22-1/2 x 15-3/16 (572 x 386)

 

 

 

 

 

 

R2 3

Refrigerant Access (Bottom)

86 (2184)

13-7/8

(352)

16-7/16 x 4 (418 x 102)

 

 

 

 

 

 

53kW (15 ton)/70 & 77kW (20 & 22 ton)

 

 

 

 

 

 

L1

Liquid Line System 1

97 (2464)

16-3/4

(425)

1/2 / 5/8 Cu Sweat

L2

Liquid Line System 2

93-5/16

(2370)

16-3/4 (425)

1/2 / 5/8 Cu Sweat

 

 

 

 

 

 

G1

Hot Gas Discharge 1

90-5/8 (2302)

16-5/8

(422)

7/8 / 1-1/8 Cu Sweat

 

 

 

 

 

 

G2

Hot Gas Discharge 2

88 (2235)

16-5/8

(422)

7/8 / 1-1/8 Cu Sweat

R3 3

Refrigerant Access (Side)

-

 

-

 

6 x 17-3/16 (152 x 437)

 

 

 

 

 

 

 

CGD*

Condensate Gravity Drain

-

 

-

 

3/4 FPT

 

 

 

 

 

 

 

CPD

Condensate Pump Discharge (Opt)

79-5/16

(2015)

11-7/8

(302)

1/2 Cu Sweat

HUM

Humidifier Supply Line

79-5-16 (2015)

9-7/8 (251)

1/4 Cu Sweat

 

 

 

 

 

ECS**

Econ-O-Coil Supply

78-5/8 (1998)

7-7/8 (200)

2-1/8 Cu Sweat

 

 

 

 

 

ECR**

Econ-O-Coil Return

78-5/8 (1998)

4-5/8 (117)

2-1/8 Cu Sweat

E1

Electrical Connection (High Voltage)

75-3/8 (1915)

30 (762)

2-1/2

 

 

 

 

 

E2

Electrical Connection (High Voltage)

69-7/8 (1775)

30 (762)

2-1/2

 

 

 

 

 

 

LV1

Electrical Connection (Low Voltage)

19-1/2

(495)

29-1/16 (738)

7/8

LV2

Electrical Connection (Low Voltage)

19-1/2

(495)

30-1/2 (775)

7/8

 

 

 

 

 

 

LV3

Electrical Connection (Low Voltage)

19-1/2

(495)

31-15/16 (811)

7/8

 

 

 

 

 

 

 

*Field-pitch condensate drain line a minimum of 1/8" (3.2 mm) per foot (305 mm). All units contain a factory-installed condensate trap. Do not trap external to the unit. Drain line may contain boiling water. Select appropriate drain system materials. The drain line must comply with all local codes.

**Supplied on Dual-Cool systems only (4-pipe system)

102

Page 112
Image 112
Liebert DS Top View Of Unit, Front Section View Of Unit, Left Front Panel Not Shown, Left Side Section View Of Unit, Point