10.0CHECKLIST FOR COMPLETED INSTALLATION

Checklist for Completed Installation

10.0CHECKLIST FOR COMPLETED INSTALLATION

10.1Moving and Placing Equipment

___ 1. Unpack and check received material.

___ 2. Proper clearance for service access has been maintained around the equipment.

___ 3. Equipment is level and mounting fasteners are tight.

___ 4. If the equipment has been disassembled for installation, unit must be reassembled per instructions.

10.2Electrical

___ 1. Supply voltage and phase matches equipment nameplate.

___ 2. Wiring connections completed between disconnect switch, evaporator unit and heat rejection equipment

___ 3. Power line circuit breakers or fuses have proper ratings for equipment installed.

___ 4. Control wiring connections completed between indoor evaporator and heat rejection equipment.

___ 5. All internal and external high- and low-voltage wiring connections are tight.

___ 6. Confirm that unit is properly grounded to an earth ground.

___ 7. Control transformer setting matches incoming power.

___ 8. Electrical service conforms to national and local codes.

___ 9. Check blowers and compressors (scroll only) for proper rotation.

___ 10. Upflow units only: Field installed low volt wiring routed with loop to allow electric box to swing.

10.3Piping

___ 1. Piping completed to refrigerant or coolant loop (if required).

___ 2. Piping had been leak-checked, evacuated and charged (if required).

___ 3. Piping is properly sized, sloped, trapped as shown in the piping schematics

___ 4. Check piping inside and outside of equipment for proper support.

___ 5. Ensure that factory clamps have been reinstalled

___ 6. Drain line connected and pitched per local code.

___ 7. Water supply line connected to humidifier

10.4Other

___ 1. Ducting complete (if required), maintain access to filters.

___ 2. Filters installed.

___ 3. Check fasteners that secure compressors, reheats, humidifier and motors—some may have become loose during shipment

___ 4. Verify water detection is properly installed around all units (recommended)

___ 5. Control panel DIP switches are set based on user requirements

___ 6. Blower drive system rotates freely and belts are properly aligned and tensioned

___ 7. Compressor shipping blocks removed and springs adjusted (see 5.3 - Semi-Hermetic Compressor Spring Isolation System).

___ 8. Remove rubber band from float in optional infrared humidifier.

___ 9. Installation materials and tools have been removed from equipment (literature, shipping materials, construction materials, tools, etc.)

___ 10. Locate blank startup sheet, ready for completion by installer or startup technician.

107

Page 117
Image 117
Liebert DS user manual Moving and Placing Equipment, Electrical, Piping, Other, Checklist For Completed Installation