Piping Schematics

Figure 69 Primary connection locations—downflow, air-Cooled, 53-77kW (15-22 ton), semi-hermetic compressor models

Note: Drawing not to scale

 

 

 

 

All dimensions

 

Tolerance on all

 

 

 

 

from rear corner

 

piping dimensions

 

 

 

 

of unit including

 

A

 

 

A

panels

 

is ± 1/2" (13mm)

Front View

 

 

 

 

 

 

 

X

 

 

 

 

 

 

Section A-A

 

 

 

 

 

 

 

 

O

 

 

 

 

 

 

Blower

16-1/16"

Blower

Y

 

 

 

 

R

 

Outlet

(408 mm)

Outlet

 

 

 

 

 

 

 

 

4" (102mm)

 

 

 

 

 

 

B1

35"

L1

L2

G1

G2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B2

 

(889mm)

 

16-7/16"

 

ECS

 

 

 

 

 

 

 

 

(418mm)

 

 

 

 

 

 

 

 

 

 

 

 

 

HUM

ECR

 

LV1

 

 

 

 

 

CD

 

LV2

 

 

 

 

 

 

 

 

 

 

LV3

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E1 E2

Front of Unit

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

109"

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

(2769mm)

 

DPN000928

 

 

 

 

 

 

 

 

 

 

Rev. 2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

X

 

Y

Connection Size / Opening

Point

 

 

Description

 

inches (mm)

 

inches (mm)

inches (mm)

R

Refrigerant Access

 

82-3/4 (2102)

 

 

13-7/8 (352)

16-7/16 x 4 (418 x 102)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

53kW (15ton) / 70 & 77kW (20 & 22ton)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L1

Liquid Line System 1

 

97 (2464)

 

 

16-7/8 (428)

1/2 / 5/8 Cu Sweat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

L2

Liquid Line System 2

 

93-5/16 (2370)

 

 

16-7/8 (428)

1/2 / 5/8 Cu Sweat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G1

Hot Gas Discharge 1

 

90-5/8 (2302)

 

 

16-5/8 (422)

7/8 / 1-1/8 Cu Sweat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

G2

Hot Gas Discharge 2

 

88 (2235)

 

 

16-5/8 (422)

7/8 / 1-1/8 Cu Sweat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

CD

Condensate Drain *

 

69-1/4 (1759)

 

 

30 (762)

3/4 FPT

 

 

 

 

 

 

 

 

 

 

 

 

 

 

W/ Optional Pump

 

69-1/4 (1759)

 

 

30 (762)

1/2 Cu Sweat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HUM

Humidifier Supply Line

 

76-1/2 (1943)

 

 

29 (736)

1/4 Cu Sweat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ECS**

Econ-O-Coil Supply

 

78-5/8 (1997)

 

 

22-1/4 (565)

2-1/8 Cu Sweat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

ECR**

Econ-O-Coil Return

 

72 (1829)

 

 

29 (737)

2-1/8 Cu Sweat

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HS

Hot Water Reheat Supply

 

 

 

 

 

Consult Factory

 

 

 

 

 

 

 

 

 

 

 

 

 

 

HR

Hot Water Reheat Return

 

 

 

 

 

Consult Factory

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E1

Electrical Connection (High Volt)

 

78-1/2 (1994)

 

 

31-1/8 (790)

2-1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

E2

Electrical Connection (High Volt)

 

75-3/8 (1915)

 

 

31-1/8 (790)

2-1/2

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LV1

Electrical Connection (Low Volt)

 

1-7/8 (48)

 

 

28-1/2 (724)

7/8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LV2

Electrical Connection (Low Volt)

 

1-7/8 (48)

 

 

30-1/4 (768)

7/8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

LV3

Electrical Connection (Low Volt)

 

1-7/8 (48)

 

 

32 (813)

7/8

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B1

Blower Outlet (15 x 15)

 

23-1/8 (587)

 

 

18-1/16 (459)

18-3/4 x 16-1/16 (476 x 408)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Blower Outlet (15 x 11)

 

27-3/4 (705)

 

 

18-1/16 (459)

14-3/4 x 16-1/16 (375 x 408)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

B2

Blower Outlet (15 x 15)

 

50-3/8 (1280)

 

 

18-1/16 (459)

18-3/4 x 16-1/16 (476 x 408)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Blower Outlet (15 x 11)

 

54-3/8 (1381)

 

 

18-1/16 (459)

14-3/4 x 16-1/16 (375 x 408)

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

*Field-pitch condensate drain line a minimum of 1/8" (3.2mm) per foot (305mm). All units contain a factory-installed condensate trap. Do not trap external to the unit. Drain line may contain boiling water. Select appropriate drain system materials. The drain line must comply with all local codes.

**Supplied on Dual-Cool systems only (4-pipe system)

94

Page 104
Image 104
Liebert DS user manual 53kW 15ton / 70 & 77kW 20 & 22ton