C. Sequence of Operation
The steps in the sequence are as outlined below. When power is supplied, the power switch is in the "ON" position, the door switch is engaged, and the control switch is in the "ICE" position, the "POWER" LED on the control board comes on.
1. Fill Cycle
WV opens and the reservoir fills with water until UF/S closes. Note: GM will not start unless UF/S is closed. For details, see "IV. Service Diagnosis".
2. Ice Purge Cycle (60 seconds)
"GM" LED is on. WCR energizes, closing the low water safety circuit and
3. Freeze Cycle
"COMP", "GM" LEDs are on. Comp and FMS energize. As the water in the evaporator cools, ice starts forming within 4 to 6 minutes. This time frame depends on the inlet water and ambient temperature conditions. UF/S and LF/S operate WCR and WV as needed to continue the icemaking process. This continues until BC shuts the icemaker down or power is turned off to the icemaker.
4. Drain Cycle
12 hour DT activates, "FLUSH" LED is on after 150 second shutdown sequence. Comp and FMS
20minutes.
5.Shutdown
BC is activated and a 150 second shutdown sequence begins. After BC has been open for 90 seconds, Comp and FMS
Legend:
12