4. 12 Hour Drain Cycle
DV opens for 20 minutes every 12 hours
See "3. 12 Hour Drain Cycle" below.
1. Startup
Power switch "ON" Control switch in "ICE"
1. Fill Cycle
2.Ice Purge Cycle
60 seconds
3. Freeze Cycle
Refill (90 seconds)
Low Water Safety
If refill > 90 sec. FT, 150 second shutdown sequence begins
150 sec. Shutdown Sequence
|
|
|
90 seconds |
| 60 seconds |
|
|
|
13
|
|
|
|
|
|
|
|
|
|
| UF/S open | LF/S closed |
|
|
|
|
|
|
|
|
WV on |
|
|
| LF/S closed | Comp on | UF/S open | Comp off | GM off | ||||||||||||
|
| |||||||||||||||||||
|
| UF/S open |
| LF/S open (WV on) | UF/S closed (WV off) | |||||||||||||||
|
|
| UF/S closed (WV off) | FMS on | WCR off | WCR on | FT exceeded | FMS off | GMPR off | |||||||||||
| ||||||||||||||||||||
|
|
|
|
|
| WCR on | WCR continues | Comp continues | WV continues | HCR off | ||||||||||
|
|
|
|
|
| FT started (90 sec.) | FT off (90 sec.) | |||||||||||||
|
|
|
|
|
| WV off | GM continues | FMS continues | GM continues | HTR off | ||||||||||
|
|
|
|
|
| WV on | WV off | |||||||||||||
|
|
|
|
|
| GM on | GMPR continues | GM continues | GMPR continues | WV continues until | ||||||||||
|
|
|
|
|
| GMPR on | HCR continues | Comp continues | Comp continues | GMPR continues | HCR continues | UF/S closes | ||||||||
|
|
|
|
|
| FMS continues | FMS continues | |||||||||||||
|
|
|
|
|
| HCR on | HTR continues | HCR continues | HTR continues |
|
|
| ||||||||
|
|
|
|
|
| GM continues | GM continues |
|
|
| ||||||||||
|
|
|
|
|
| HTR on |
|
| HTR continues |
|
|
|
|
| ||||||
|
|
|
|
|
|
|
| GMPR continues | GMPR continues |
|
|
|
|
| ||||||
|
|
|
|
|
|
|
|
|
|
| WV continues |
|
|
|
|
| ||||
|
|
|
|
|
|
|
|
|
|
| HCR continues | HCR continues |
|
|
|
|
| |||
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
| ||
|
|
|
|
|
|
|
|
|
|
| HTR continues | HTR continues |
|
|
|
|
|
|
|
|
2.Shutdown & Restart
3.12 Hour Drain Cycle Shutdown & Restart
|
| 1. Bin Full |
|
| 2. Ice Purge Cycle | ||||||
|
| ||||||||||
| 150 |
|
|
|
|
|
|
| |||
| seconds | ||||||||||
|
|
|
|
|
|
|
|
|
|
|
|
|
| 90 seconds |
| 60 seconds | |||||||
|
|
|
|
|
|
|
|
|
|
|
|
| 1. Drain Cycle initiates |
|
|
| 2. Ice Purge Cycle | ||||||
|
|
|
| ||||||||
|
|
|
|
|
|
|
|
|
|
|
|
| 3. Icemaker is Off |
| 4. Ice Level Lowered | |
|
| |||
|
|
| See "1. Fill Cycle" above | |
|
|
|
|
|
3. Drain Cycle | 4. 12 hour DC - Restart |
DV on for 20 minutes | See "1. Fill Cycle" above |
Legend:
BC - bin control
Comp - compressor
DC - drain cycle
DT - drain timer
DV - drain valve
FMS -
BC open or DC starts | Comp off |
Comp continues | FMS off |
FMS continues | GM continues |
GM continues | GMPR continues |
GMPR continues | HCR continues |
HCR continues | HTR continues |
HTR continues |
|
GM off | BC closed |
GMPR off | or |
HCR off | 20 Min. DT off (DC only) |
HTR off | DV off (DC only) |
DV on (DC only) | 12 hour DT reset (DC only) |
FT - fill timer (low water safety) GM - gear motor
GMPR - gear motor protect relay HCR - heater control relay HTR - extruding head heater LF/S - lower float switch
UF/S - upper float switch WCR - water control relay
Components Energized when the Control Switch is in the "DRAIN" Position
The "DRAIN" position on the control switch is used when cleaning and sanitizing the unit. This allows cleaner and sanitizer to drain from the reservoir and evaporator assembly. When switching to the "DRAIN" position during the freeze cycle, the drain valve does not energize until the 150 second shutdown sequence terminates (2. Shutdown & Restart).
Note: To bypass the 150 second shutdown sequence, move the power switch to the "OFF" position, place the control switch in the "DRAIN" position, then move the power switch back to the "ON" position.
WV - inlet water valve