Hoshizaki KM-1301SRH-E, KM-1301SAH-E, KM-1301SWH-E service manual PressureSwitch

Page 30

b) KM-1301SWH-E (water-cooled)

 

 

 

Transformer Output

10.5V at 115V

 

 

*

PressureSwitch

384±21

284±21PSIG

 

 

PSIG

 

 

 

0

 

 

* High-

Cut-out

Cut-in

30

 

 

 

Image 30
Contents Superior Degree Reliability Hoshizaki AMERICA, INC Contents Page Indicates important information about the use and care Important Safety InformationSerious injury UnitSpecifications Icemaker KM-1301SAH-E air-cooledKM-1301SWH-E water-cooled KM-1301SRH-E remote air-cooled Condenser Unit URC-14FESpecifications II. General Information Construction KM-1301SWH-E water-cooled Separators Minute Fill Cycle Sequence of OperationSequence Cycles and Shutdown Initial Harvest CyclePump-Out Cycle S4 Dip Switch Setting Pump-Out 1st Pump-Out FrequencyFreeze Cycle Harvest CycleMechanical Bin Control KM-1301SWH-E, KM-1301SRH-E Cycle at Shutdown Mechanical Bin Control ActivationPump-Out Cycle Sequence Flow ChartCycle Steps Minute Fill Harvest Cycle Mechanical BC Bin Full Shutdown and RestartControl Board Control Board Layout Control BoardSequence Step LED Lights and Audible Alarm SafetiesNo. of Beeps Type of Alarm Every 3 sec Time LEDs are OnControls and Adjustments Default Dip Switch SettingsHarvest Timer S4 dip switch 1 Pump-Out Timer S4 dip switch 3 Pump-Out Frequency Control S4 dip switch 5Time seconds Inlet Freeze Timer S4 dip switch 9 Harvest Pump Timer S4 dip switchFactory Use S4 dip switch S4 Dip Switch Setting Pump Motor Time secondsControl Switch Float Switch Control S5 dip switchRefill Counter S5 dip switch 2 through Tank Water Tank Headmaster Service Drier Valve Thermistor KM-1301SAH-E air-cooled Wiring DiagramsAuxiliary Code T-0, U-0 U-0 Auxiliary CodeAuxiliary Code U-1 and Later PressureSwitch KM-1301SRH-E remote air-cooled Performance Data 1780 13301240 13351950 12701142 2070IV. Service Diagnosis Diagnostic ProcedurePage S4 Dip Switch Setting Pump-Out 1st Pump-Out Frequency Shutdown Thermostatic Bin Control KM-1301SAH-E Mechanical Bin Control KM-1301SWH-E, KM-1301SRH-EControl Board Check Bin Control Check Thermostatic Bin Control Check KM-1301SAH-EMechanical Bin Control Check Single Unit Connection Detail Stacked Unit Connection DetailMechanical Bin Control Cleaning Float Switch Check and Cleaning Float Switch CheckFloat Switch Cleaning Adjustment of Water Regulating Valve water-cooled model Thermistor CheckDiagnostic Charts No Ice ProductionNo Ice Production Possible Cause No Ice Production Possible Cause Freeze Up Freeze Up Possible Cause Harvest CycleFreeze Up Possible Cause Freeze Cycle Low Ice Production Low Ice Production Possible Cause Long Harvest CycleLong Freeze Cycle Replacement of Components Service for Refrigerant LinesRefrigerant Recovery Brazing Evacuation and Recharge R-404APage Important Notes for Component Replacement ComponentVI. Cleaning and Maintenance Cleaning ProcedureIce Chute Float Switch Assembly Drain Plug Sanitizing Procedure Following Cleaning Procedure Maintenance Remove the water from the icemaker water supply lineDrain the water tank