Hoshizaki KM-1301SRH-E, KM-1301SAH-E, KM-1301SWH-E Headmaster Service Drier Valve Thermistor

Page 27

27

Spray Tubes

Water

Tank

Inlet Water Valve Spray Tubes

Evaporator

Check Valve

Water

Remote Condenser Unit

 

 

 

 

 

 

 

 

 

 

 

Supply

 

 

 

 

 

 

 

 

Fan

Fan

 

 

 

 

 

 

Headmaster

 

 

 

 

 

 

(C.P.R.)

 

 

Service

 

 

 

 

Drier

 

 

Valve

 

 

 

 

 

 

 

 

 

Thermistor

 

 

Access Valve

 

 

 

Receiver Tank

 

 

 

 

 

 

 

 

 

 

 

Liquid Line

 

 

Fusible Plug

 

 

 

Valve

 

 

High-Pressure

 

 

 

 

 

 

 

 

Heat Exchanger

 

 

Switch

 

 

 

 

 

 

 

Hot Gas

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Suction Line

 

 

Valve

 

 

 

Service

 

 

 

 

 

 

Valve

 

 

 

 

 

 

 

 

 

 

 

Check

 

 

 

 

 

 

 

 

 

 

 

 

 

Strainer

Valves

Float Switch

 

 

Service

 

 

 

 

 

 

 

 

 

 

Valve

 

 

 

 

 

 

 

 

 

 

 

 

Compressor

Discharge Line

 

 

 

 

 

 

 

 

Drain

 

 

 

 

 

 

 

3. KM-1301SRH-E (remote air-cooled)

Water Pump

Expansion Valves

 

Freeze/Harvest Pump-Out

Pump Timer

Refrigeration Circuit

Water Circuit

Image 27
Contents Superior Degree Reliability Hoshizaki AMERICA, INC Contents Page Unit Important Safety InformationSerious injury Indicates important information about the use and careKM-1301SAH-E air-cooled Specifications IcemakerKM-1301SWH-E water-cooled KM-1301SRH-E remote air-cooled URC-14FE Condenser UnitSpecifications II. General Information Construction KM-1301SWH-E water-cooled Separators Initial Harvest Cycle Sequence of OperationSequence Cycles and Shutdown Minute Fill CycleHarvest Cycle S4 Dip Switch Setting Pump-Out 1st Pump-Out FrequencyFreeze Cycle Pump-Out CycleCycle at Shutdown Mechanical Bin Control Activation Mechanical Bin Control KM-1301SWH-E, KM-1301SRH-EMechanical BC Bin Full Shutdown and Restart Sequence Flow ChartCycle Steps Minute Fill Harvest Cycle Pump-Out CycleControl Board Control Board Control Board LayoutTime LEDs are On LED Lights and Audible Alarm SafetiesNo. of Beeps Type of Alarm Every 3 sec Sequence StepControls and Adjustments Default Dip Switch SettingsHarvest Timer S4 dip switch 1 Pump-Out Timer S4 dip switch 3 Pump-Out Frequency Control S4 dip switch 5Time seconds Inlet S4 Dip Switch Setting Pump Motor Time seconds Harvest Pump Timer S4 dip switchFactory Use S4 dip switch Freeze Timer S4 dip switch 9Control Switch Float Switch Control S5 dip switchRefill Counter S5 dip switch 2 through Tank Water Tank Headmaster Service Drier Valve Thermistor U-0 Auxiliary Code Wiring DiagramsAuxiliary Code T-0, U-0 KM-1301SAH-E air-cooledAuxiliary Code U-1 and Later PressureSwitch KM-1301SRH-E remote air-cooled Performance Data 1335 13301240 17802070 12701142 1950Diagnostic Procedure IV. Service DiagnosisPage S4 Dip Switch Setting Pump-Out 1st Pump-Out Frequency Mechanical Bin Control KM-1301SWH-E, KM-1301SRH-E Shutdown Thermostatic Bin Control KM-1301SAH-EControl Board Check Bin Control Check Thermostatic Bin Control Check KM-1301SAH-EMechanical Bin Control Check Stacked Unit Connection Detail Single Unit Connection DetailMechanical Bin Control Cleaning Float Switch Check Float Switch Check and CleaningFloat Switch Cleaning Thermistor Check Adjustment of Water Regulating Valve water-cooled modelDiagnostic Charts No Ice ProductionNo Ice Production Possible Cause No Ice Production Possible Cause Freeze Up Possible Cause Harvest Cycle Freeze UpFreeze Up Possible Cause Freeze Cycle Low Ice Production Low Ice Production Possible Cause Long Harvest CycleLong Freeze Cycle Replacement of Components Service for Refrigerant LinesRefrigerant Recovery Evacuation and Recharge R-404A BrazingPage Component Important Notes for Component ReplacementCleaning Procedure VI. Cleaning and MaintenanceIce Chute Float Switch Assembly Drain Plug Sanitizing Procedure Following Cleaning Procedure Remove the water from the icemaker water supply line MaintenanceDrain the water tank