Manitowoc Ice S1800 service manual High Pressure CUT-OUT Hpco Control, Function

Page 85

Section 7

Refrigeration System

 

 

Pressure Control Specifications and Diagnostics

HIGH PRESSURE CUT-OUT (HPCO) CONTROL

Function

Stops the ice machine if subjected to excessive high- side pressure.

The HPCO control is normally closed, and opens on a rise in discharge pressure.

Specifications

Cut-out:

450 psig ±10 (3103 kPa ±69, 31 Bar ±.69)

Cut-in:

Manual or automatic reset

 

Must be below 300 psig (2068 kPa, 20.68

 

Bar ±.69) to reset

Check Procedure

1.Set ICE/OFF/CLEAN switch to OFF.

2.Connect manifold gauges.

3.Hook voltmeter in parallel across the HPCO, leaving wires attached.

4.Close the water service valve to the water condenser inlet.

5.Set ICE/OFF/CLEAN switch to ICE.

6.No water flowing through the condenser will cause the HPCO control to open because of excessive pressure. Watch the pressure gauge and record the cut-out pressure.

!Warning

If discharge pressure exceeds 460 psig (2068 kPa,

20.68Bar ) and the HPCO control does not cut out, set ICE/OFF/CLEAN switch to OFF to stop ice machine operation.

Replace the HPCO control if it:

Will not reset [below 300 psig (2068 kPa, 20.68 Bar )]

Does not open at the specified cut-out point

Part Number 80-1634-3

7-19

Image 85
Contents Service Manual Personal Injury Potential Read These Before ProceedingTable of Contents Section Maintenance Table of Contents Section Ice Machine OperationSection Before Calling For Service Section Refrigeration System Table of Contents Section Electrical SystemTable of Contents Model Numbers How to Read a Model NumberIce Cube Sizes Self-Contained Water-CooledGeneral Information Section Accessories Model/Serial Number Location Section General Information Model/Serial Number LocationWarranty Coverage Width, Depth, and Height Dimensions Ice Machine DimensionsElectrical and AuCS Dimensions GeneralIce Machine Heat of Rejection Installation Instructions Section Location of Ice MachineS1800M Water-Cooled Series Heat of Rejection Ice Machine Air ConditioningVoltage Section Installation Instructions Electrical ServiceMinimum Circuit Ampacity Electrical RequirementsSelf Contained ICE Machine 115/1/60 or 208-230/1/60 For United Kingdom OnlySelf Contained ICE Machine 208-230/3/60 Self Contained ICE Machine 230/1/50Water Supply Cooling Tower ApplicationsWater Inlet Lines Drain ConnectionsTypical Water Supply Drain Installation Installation Instructions SectionWater Supply and Drain Line SIZING/CONNECTIONS CondenserSection Installation Instructions Installation Check List Potential Personal Injury Situation AuCS Automatic Cleaning SystemComponent Identification Section Ice Machine OperationInitial START-UP or START-UP After Automatic SHUT-OFF Ice Machine Operation Section Sequence Of OperationHarvest Sequence 5. Water Purge Safety TimersHarvest Automatic SHUT-OFF 7. Automatic Shut-OffWater Level Ice Machine Operation Section Operational ChecksICE Thickness Check Ice Thickness CheckHarvest Sequence Water Purge Water Purge AdjustmentThis page Intentionally Left Blank Ice Machine Operation SectionIce Machine Inspection Exterior CleaningWater-Cooled Condenser Water Regulating Valve AlphaSan→Installation Maintenance Section GuardianSachet Replacement Frequency Sachet Replacement ProcedureCleaning Procedure Section Maintenance Interior Cleaning and SanitizingModel Amount of Cleaner StepSanitizing Procedure Maintenance SectionSolution Type Water Mixed With Sanitizer Solution Type Water Mixed With Removal of Parts for CLEANING/SANITIZINGWater Curtain Removal Ice Thickness Probe Water CurtainIce Thickness Probe Removal Water Trough Water Distribution TubeWater Distribution Tube Removal Water Pump Water Level ProbeWater Pump Removal Water Dump Valve Dump Valve DisassemblyDrain Line Check Valve Evaporator Tray RemovalWater Inlet Valve Pry Open the Water Regulating Valve AUCS→ Accessory Maintenance Section Removal from Service/WinterizationSELF-CONTAINED WATER-COOLED ICE Machines Problem Possible Cause To Correct ChecklistSafety Limit Feature Before Calling For Service SectionSection Electrical System Energized Parts ChartsSELF-CONTAINED WATER-COOLED Models Initial Start-Up or Start-Up After Automatic Shut-Off SELF-CONTAINED ModelsWater Purge Self-Contained Water PurgeRefrigeration System START-UP Refrigeration System Start Up 5 Seconds Toggle SwitchSelf-Contained Refrigeration System Start-Up Freeze Sequence Electrical System SectionPRE-CHILL Self-Contained Pre-Chill Self-Contained ModelsFreeze Toggle Switch Bin Switch Control Board RelaysSelf-Contained Freeze Self-Contained Models Harvest Sequence Harvest Automatic SHUT-OFF Automatic Shut-OffSelf-Contained Automatic Shut-Off Wiring Diagram Legend Section Electrical System Wiring DiagramsControl Board S1800 SELF-CONTAINED 1 PhaseS1800 SELF-CONTAINED 3 Phase Check Procedure SpecificationsBIN Switch Main FuseDiagnostic Aids SymptomsContinuity Test Water Curtain Removal NotesCheck Resistance Ohm Values Compressor Electrical DiagnosticsCheck Motor Windings to Ground Determine if the Compressor is SeizedWhat is a PTCR? Ptcr DiagnosticsCompressor Start Sequence WHY a Good Ptcr MAY Fail To Start the Compressor Troubleshooting PTCR’sModel Automatic Shut-Off and Restart During Start-Up First .25 1.0 SecondsManitowoc Ptcr Checking the PtcrModel Manitowoc Cera-Mite Room Part NumberCapacitor Diagnosing Start ComponentsRelay Relay Operation CheckSwitch Setting Terminals Ohm Reading ICE/OFF/CLEAN Toggle SwitchControl Board Electronic Control BoardInputs Safety LimitsIce Thickness Probe Cleaning Freeze Time LOCK-IN FeatureHOW the Probe Works Harvest LightMonitoring of Harvest Light Correction Diagnosing ICE Thickness Control CircuitryElectrical System Section Water Level Control Circuitry Water Inlet Valve Safety SHUT-OFFWater Level Probe Light Freeze Cycle CircuitryDiagnosing Water Level Control Circuitry Problem Water Trough Overfilling During Freeze CycleWait until the freeze cycle starts On or OFF Step Check Self Contained 1 Phase with Terminal Board Freeze Cycle Refrigeration Sequence SELF-CONTAINED Water -COOLED ModelsRefrigeration System Section S1800 SELF-CONTAINED Tubing Schematic General Weights are in pounds Before Beginning ServiceICE Production Check Times are in minutesWater System Checklist INSTALLATION/VISUAL Inspection ChecklistPossible Problem Corrective Action Extremely Thin at Evaporator Outlet ICE Formation PatternNormal Ice Formation No Ice Formation Extremely Thin at Evaporator InletSafety Limit Indication Safety LimitsAnalyzing Why Safety Limits May Stop the Ice Machine Possible Cause Check/Correct Safety Limit NotesSection Refrigeration System Freeze Cycle Discharge Pressure High Checklist ProcedureFreeze Cycle Discharge Pressure Low Checklist Analyzing Discharge Pressure During Freeze or Harvest CycleAnalyzing Suction Pressure During Freeze Cycle Step Example Using SY1004A Model Ice MachineFreeze Cycle Suction Pressure Low Checklist Freeze Cycle Suction Pressure High ChecklistHarvest Valve Analysis Harvest Valve Temperature Check GeneralFindings Comments Discharge Line Temperature Analysis General Column 1 Harvest Valve Leaking Final AnalysisColumn 2 LOW CHARGE/TXV Starving Column 3 TXV FloodingModels Dual Expansion Valve Ice Machine Model Number Refrigeration System Operational Analysis TablesHigh Pressure CUT-OUT Hpco Control Self-Contained Water-Cooled Cycle Times S1800 SeriesHour Ice Production Operating PressuresConnections SELF-CONTAINED RECOVERY/EVACUATIONCharging Connections Self-Contained Charging ProceduresDetermining Severity Of Contamination System Contamination CLEAN-UPSevere System Contamination Cleanup Procedure Mild System Contamination Cleanup ProcedureSection Refrigeration System 10. Using Pinch-Off Tool Drier End Part Model Connection Size Number FILTER-DRIERSSeries Version Charge S1800M Total System Refrigerant Charges48 oz New Product Specifications RecoverRefrigerant Definitions RecycleRefrigerant RE-USE Policy Recovered or Recycled RefrigerantNew Refrigerant Reclaimed RefrigerantHFC Refrigerant Questions and Answers This page Intentionally Left Blank Page Attend a Manitowoc Factory Service School