Jackson Tempstar GP technical manual Table of Contents

Page 2

TABLE OF CONTENTS

GENERAL

PAGE

Specifications

1

INSTALLATION

 

Unpacking

2

Plumbing Connections

2

Electrical Connections

2

Gas Connection

3

OPERATING INSTRUCTIONS

 

Preparation

4

Power Up

4

Initial Fill

4

Preparing the Dishes

4

Daily Machine Preparation

4

Washing a Rack of Ware

4

Shut Down and Cleaning

4

OVERVIEW OF OPERATION

5

THERMOSTAT ADJUSTMENT PROCEDURE

7

AUTO-CALIBRATION PROCEDURE

8

ELECTRONICS CONTROL BOARD (ECB)

9

TESTING THERMISTORS

10

CONTROL BOARD LED LIGHT INDICATIONS

11

TROUBLESHOOTING

12

DIMENSIONS

19

TABLE DIMENSIONS

20

PHOTOGRAPHS

 

Main Assembly

21

Control Box Assembly-Front View

22

Control Box Assembly-Top View

23

Hood Assembly

25

Cantilever Arm Assembly

26

Tub Assembly

27

Back of Tub, & Drain Assembly

28

Lower Assembly (Right Side)

29

Incoming Plumbing Assembly

30

Gas Pack Assembly

32

Upper Wash, & Rinse Arm Assembly

33

Lower Wash, & Rinse Arm Assembly

34

Steam Coil Assembly

35

Rinse Tank Assembly

37

Electronic Control Drawer Components

38

SCHEMATICS

 

110/120 Volt Schematic

39

208/240 Volt Schematic

40

i

Image 2
Contents Technical Manual Table of Contents Specifications of the Tempstar GP Installation Instructions GAS Connection Operation Instructions Overview of Operation Overview of Operation Thermostat Adjustment Procedure AUTO-CALIBRATION Procedure Auto CalibrationTesting and Setting the Set Point Temperature Electronics Control Board ECBTesting the Thermistors To test the temperature at the T-in ThermistorControl Board LED Light Indications Green LED is offTroubleshooting Section Symptom Possible Cause ActionTroubleshooting Section Leaks do not USE Flame Low rinse temperature/low wash Low inlet water temperature Polarity will Damage the Circuit Boards DSICombination cutoff valve and the modulating Check ignition wire. Check that lights above Dimensions Table Dimensions Main Assembly Shown Not ShownControl BOX Assembly Front View QTY Description MFG noControl BOX Assembly TOP View Control BOX ASSEMBLY-TOP View Hood Assembly Cantilever ARM Assembly TUB Assembly Back of TUB, & Drain Assembly Lower Assembly Right Side Incoming Plumbing Assembly Incoming Plumbing Parts Lists GAS Pack Assembly Upper WASH, & Rinse ARM Assembly Lower WASH, & Rinse ARM Assembly Steam Coil Assembly Steam Coil Assembly Parts Lists Rinse Tank Assembly Electronic Control Drawer Components RED Green LEDElectrical Diagram 208/240 Volt 60 Hertz 1 Phase