Jackson Tempstar GP technical manual Overview of Operation

Page 7

OVERVIEW OF OPERATION

PRESSURE

GAUGE

REGULATOR

RINSE ARM

CHECK VALVE

WASH TANK

WATER LEVEL

WL

PROBE

THERMOSTAT TS

WASH TANK

COILS T

WASH TEMP 150-165 F

RECIRCULATING

PUMP

VACUUM BREAKER

FILL / RINSE SOLENOID

T

RINSE TEMP

>180 F

 

CHECK VALVE

BOOSTER

TANK

ECO

T-MID

HEAT

EXCHANGER

BURNER

ASSEMBLY

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

MODULATING

COMBINATION GAS

 

 

VALVE

CUTOFF VALVE

 

 

 

 

 

 

 

 

 

 

 

 

 

The Tempstar GP heating system is designed to heat and maintain the wash tank water temperature at a minimum of 150 F as well as providing a constant 180 F rinse water temperature. Incoming water is supplied at a pressure of 20psi and between 110- 140 F. Incoming gas pressure should be between 7.0-10.5 WCI for natural gas, or 11.0-14.0 WCI for units supplied with propane. The sequence of operation is as follows (please refer to the above diagram):

When the power is turned on at the ON/OFF switch the water level control board will sense a low water level in the wash tank and the unit will begin to fill. This occurs as the rinse solenoid valve opens, allowing connected water to fill the booster tank, heat exchanger and the rest of recirculating system, once the booster tank is full, water will fill the wash tank until the water level control sys- tem is satisfied. Simultaneously with the fill, the rinse recirculating pump and the gas burner assembly are energized, this will begin heat up of the unit. A transformer in the main control box supplies +12vdc to the electronics control drawer located in the lower section of the unit. The electronics control board (ECB) is the brain of the system. The ECB receives various inputs and determines the amount of heating required.

When energized the ECB receives input from the T-mid thermistor indicating a low water temperature in the recirculating sys- tem. The ECB will power the ignition relay on the board, which in turn provides +12vdc to the direct spark ignition board (DSI). The DSI sends +12vdc to the combination gas cutoff valve to open it. This will supply gas to the burner assembly. The DSI begins sparking the igniter probe, and monitors the flames presence. If the flame is not sensed during the ignition attempt, then the DSI will lockout until the software resets the DSI approximately 60 seconds later.

5

Image 7
Contents Technical Manual Table of Contents Specifications of the Tempstar GP Installation Instructions GAS Connection Operation Instructions Overview of Operation Overview of Operation Thermostat Adjustment Procedure Auto Calibration AUTO-CALIBRATION ProcedureElectronics Control Board ECB Testing and Setting the Set Point TemperatureTo test the temperature at the T-in Thermistor Testing the ThermistorsGreen LED is off Control Board LED Light IndicationsSymptom Possible Cause Action Troubleshooting SectionTroubleshooting Section Leaks do not USE Flame Low rinse temperature/low wash Low inlet water temperature DSI Polarity will Damage the Circuit BoardsCombination cutoff valve and the modulating Check ignition wire. Check that lights above Dimensions Table Dimensions Shown Not Shown Main AssemblyQTY Description MFG no Control BOX Assembly Front ViewControl BOX Assembly TOP View Control BOX ASSEMBLY-TOP View Hood Assembly Cantilever ARM Assembly TUB Assembly Back of TUB, & Drain Assembly Lower Assembly Right Side Incoming Plumbing Assembly Incoming Plumbing Parts Lists GAS Pack Assembly Upper WASH, & Rinse ARM Assembly Lower WASH, & Rinse ARM Assembly Steam Coil Assembly Steam Coil Assembly Parts Lists Rinse Tank Assembly RED Green LED Electronic Control Drawer ComponentsElectrical Diagram 208/240 Volt 60 Hertz 1 Phase