Jackson Tempstar GP technical manual Incoming Plumbing Assembly

Page 32

INCOMING PLUMBING ASSEMBLY

26

 

25

 

24

 

23

 

22

 

21

 

 

 

 

 

 

 

 

 

 

 

01

02

03

04

05

06

07

08

09

10

20

19

18

17

16

15

14

13

12

11

30

Image 32
Contents Technical Manual Table of Contents Specifications of the Tempstar GP Installation Instructions GAS Connection Operation Instructions Overview of Operation Overview of Operation Thermostat Adjustment Procedure AUTO-CALIBRATION Procedure Auto CalibrationTesting and Setting the Set Point Temperature Electronics Control Board ECBTesting the Thermistors To test the temperature at the T-in ThermistorControl Board LED Light Indications Green LED is offTroubleshooting Section Symptom Possible Cause ActionTroubleshooting Section Leaks do not USE Flame Low rinse temperature/low wash Low inlet water temperature Polarity will Damage the Circuit Boards DSICombination cutoff valve and the modulating Check ignition wire. Check that lights above Dimensions Table Dimensions Main Assembly Shown Not ShownControl BOX Assembly Front View QTY Description MFG noControl BOX Assembly TOP View Control BOX ASSEMBLY-TOP View Hood Assembly Cantilever ARM Assembly TUB Assembly Back of TUB, & Drain Assembly Lower Assembly Right Side Incoming Plumbing Assembly Incoming Plumbing Parts Lists GAS Pack Assembly Upper WASH, & Rinse ARM Assembly Lower WASH, & Rinse ARM Assembly Steam Coil Assembly Steam Coil Assembly Parts Lists Rinse Tank Assembly Electronic Control Drawer Components RED Green LEDElectrical Diagram 208/240 Volt 60 Hertz 1 Phase