Jackson Tempstar GP technical manual Electrical Diagram

Page 41

Tempstar GP

ELECTRICAL DIAGRAM

110/120 VOLT - 60 HERTZ - 1 PHASE

39

Image 41
Contents Technical Manual Table of Contents Specifications of the Tempstar GP Installation Instructions GAS Connection Operation Instructions Overview of Operation Overview of Operation Thermostat Adjustment Procedure Auto Calibration AUTO-CALIBRATION ProcedureElectronics Control Board ECB Testing and Setting the Set Point TemperatureTo test the temperature at the T-in Thermistor Testing the ThermistorsGreen LED is off Control Board LED Light IndicationsSymptom Possible Cause Action Troubleshooting SectionTroubleshooting Section Leaks do not USE Flame Low rinse temperature/low wash Low inlet water temperature DSI Polarity will Damage the Circuit BoardsCombination cutoff valve and the modulating Check ignition wire. Check that lights above Dimensions Table Dimensions Shown Not Shown Main AssemblyQTY Description MFG no Control BOX Assembly Front ViewControl BOX Assembly TOP View Control BOX ASSEMBLY-TOP View Hood Assembly Cantilever ARM Assembly TUB Assembly Back of TUB, & Drain Assembly Lower Assembly Right Side Incoming Plumbing Assembly Incoming Plumbing Parts Lists GAS Pack Assembly Upper WASH, & Rinse ARM Assembly Lower WASH, & Rinse ARM Assembly Steam Coil Assembly Steam Coil Assembly Parts Lists Rinse Tank Assembly RED Green LED Electronic Control Drawer ComponentsElectrical Diagram 208/240 Volt 60 Hertz 1 Phase