Jackson Tempstar GP technical manual Incoming Plumbing Parts Lists

Page 33

INCOMING PLUMBING PARTS LISTS

 

ITEM

QTY

 

DESCRIPTION

MFG NO.

 

 

 

 

 

 

 

 

01

1

Pressure Guage, 0-100 PSI

6685-111-88-34

 

 

02

1

Ball Valve, Test Cock, 1/4" Bronze

4810-011-72-67

 

 

03

1

Tee, Brass, 3/4 X 3/4 X 1/4

4730-211-04-00

 

 

04

1

Pressure Regulator

 

6685-011-58-22

 

 

05

1

Incoming Plumbing Support Bracket

5700-021-34-02

 

 

06

1

Magnet, Reed Switch

5930-111-51-68

 

 

07

1

Reed Switch

 

5930-111-41-70

 

 

08

1

Conduit, 1/2" X 14"

 

5700-011-46-97

 

 

09

1

Plumbing Assembly, Inlet to Rinse Tank

5700-002-18-87

 

 

10

2

Washer, Teflon

 

5330-200-11-00

 

 

11

1

Panel, Lower Back Cover

5700-002-17-99

 

 

12

1

Panel, Upper Back Cover

5700-002-17-98

 

 

13

5

Locknut, 10-24 s/s Hex w/Nylon Insert

5310-373-01-00

 

 

14

1

Clamp, Nylon 1 1/4"

 

4730-011-51-16

 

 

15

1

Conduit, 3/4" X 37 1/2"

5700-002-19-08

 

 

16

1

Plumbing Assembly, Outlet From Rinse Tank

5700-002-18-90

 

 

17

1

Clamp, Double Pipe

 

5700-002-23-89

 

 

18

1

Washer, 1/4" ID s/s

 

5311-174-01-00

 

 

18

1

Locknut, 1/4-20 s/s Hex w/Nylon Insert

5310-374-01-00

 

 

19

2

Gasket, Vellumoid

 

5330-111-42-81

 

 

20

4

Union, Brass, 3/4"

 

4730-212-05-00

 

 

21

2

Elbow, 3/4" 90 Deg Street Brass

4730-206-04-34

 

 

22

1

Rinse Injector SDS Weldment

5700-021-47-65

 

 

23

3

Plug, 1/8" NPT Brass

 

4730-209-07-37

 

 

24

1

Vacuum Breaker, 3/4"

4820-300-08-00

 

 

25a

1

Solenoid Valve, 3/4"

110v

4810-100-53-00

 

 

25b

1

Solenoid Valve, 3/4"

240v

4810-100-03-18

 

 

26

3

Close Nipple, 3/4" Brass

4730-207-34-00

 

 

 

 

 

 

 

 

31

Image 33
Contents Technical Manual Table of Contents Specifications of the Tempstar GP Installation Instructions GAS Connection Operation Instructions Overview of Operation Overview of Operation Thermostat Adjustment Procedure Auto Calibration AUTO-CALIBRATION ProcedureElectronics Control Board ECB Testing and Setting the Set Point TemperatureTo test the temperature at the T-in Thermistor Testing the ThermistorsGreen LED is off Control Board LED Light IndicationsSymptom Possible Cause Action Troubleshooting SectionTroubleshooting Section Leaks do not USE Flame Low rinse temperature/low wash Low inlet water temperature DSI Polarity will Damage the Circuit BoardsCombination cutoff valve and the modulating Check ignition wire. Check that lights above Dimensions Table Dimensions Shown Not Shown Main AssemblyQTY Description MFG no Control BOX Assembly Front ViewControl BOX Assembly TOP View Control BOX ASSEMBLY-TOP View Hood Assembly Cantilever ARM Assembly TUB Assembly Back of TUB, & Drain Assembly Lower Assembly Right Side Incoming Plumbing Assembly Incoming Plumbing Parts Lists GAS Pack Assembly Upper WASH, & Rinse ARM Assembly Lower WASH, & Rinse ARM Assembly Steam Coil Assembly Steam Coil Assembly Parts Lists Rinse Tank Assembly RED Green LED Electronic Control Drawer ComponentsElectrical Diagram 208/240 Volt 60 Hertz 1 Phase