Jackson Tempstar GP technical manual Installation Instructions

Page 4

INSTALLATION INSTRUCTIONS

VISUAL INSPECTION: Before installing the unit, check the con- tainer and machine for damage. A damaged container is an indi- cator that there may be some damage to the machine. If there is damage to both the container and machine, do not throw away the container. The dishmachine has been inspected and packed at the factory and is expected to arrive to you in new, undamaged condition. However, rough handling by carriers or others may result in there being damage to the unit while in transit. If such a situation occurs, do not return the unit to Jackson; instead, contact the carrier and ask them to send a representative to the site to inspect the damage to the unit and to complete an inspection report.. You must contact the carrier within 48 hours of receiving the machine. Also, contact the dealer through which you pur- chased the unit.

UNPACKING THE DISHMACHINE: Once the machine has been removed from the container, ensure that there are no missing parts from the machine. This may not be obvious at first. If it is dis- covered that an item is missing, contact Jackson immediately to have the missing item shipped to you.

LEVEL THE DISHMACHINE: The dishmachine is designed to operate while being level. This is important to prevent any dam- age to the machine during operation and to ensure the best results when washing ware. The unit comes with adjustable bullet feet, which can be turned using a pair of channel locks or by hand if the unit can be raised safely. Ensure that the unit is level from side to side and from front to back before making any connec- tions.

PLUMBING THE DISHMACHINE: All plumbing connections must comply with all applicable local, state, and national plumbing codes. The plumber is responsible for ensuring that the incoming water line is thoroughly flushed prior to connecting it to any com- ponent of the dishmachine. It is necessary to remove all foreign debris from the water line that may potentially get trapped in the valves or cause an obstruction. Any valves that are fouled as a result of foreign matter left in the water line, and any expenses resulting from this fouling, are not the responsibility of the manu- facturer.

CONNECTING THE DRAIN LINE: The drain for the Tempstar- GP is a gravity discharge drain. All piping from the 1 1/2” FNPT connection on the waste accumulator must be pitched (1/4” per foot) to the floor or sink drain. All piping from the machine to the drain must be a minimum 1 1/2” I.P.S. and shall not be reduced. There must also be an air gap between the machine drain line and the floor sink or drain. If a grease trap is required by code, it should have a flow capacity of 5 gallons per minute.

WATER SUPPLY CONNECTION: Ensure that you have read the section entitled “PLUMBING THE DISHMACHINE” above before proceeding. Install the water supply line (3/4” pipe size minimum) to the dishmachine line strainer using copper pipe. It is recom- mended that a water shut-off valve be installed in the water line between the main supply and the machine to allow access for ser- vice. The water supply line is to be capable of 20 PSI “flow” pres- sure at the recommended temperature indicated on the data plate.

Do not confuse static pressure with flow pressure. Static pressure is the line pressure in a “no flow” condition (all valves and services are closed). Flow pressure is the pressure in the fill line when the fill valve is opened during the cycle.

It is also recommended that a shock absorber (not supplied with the Tempstar-GP model) be installed in the incoming water line. This prevents line hammer (hydraulic shock), induced by the sole- noid valve as it operates, from causing damage to the equipment.

PLUMBING CHECK: Slowly turn on the water supply to the machine after the incoming fill line and the drain line have been installed. Check for any leaks and repair as required. All leaks must be repaired prior to placing the machine in operation.

ELECTRICAL POWER CONNECTION: Electrical and grounding connections must comply with the applicable portions of the National Electrical Code ANSI/NFPA 70 (latest edition) and/or other electrical codes.

Disconnect electrical power supply and place a tag at the discon- nect switch to indicate that you are working on the circuit.

The dishmachine data plate is located on the right side and to the front of the machine. Refer to the data plate for machine operat- ing requirements, machine voltage, total amperage load and seri- al number.

To install the incoming power lines, open the control box. This will require taking a phillips head screwdriver and removing the one(1) screw on the front cover of the control box. Install 3/4” conduit into the pre-punched holes in the back of the control box. Route power wires and connect to power block and grounding lug. Install the service wires (L1 &L2) to the appropriate terminals as they are marked on the terminal block. Install the grounding wire into the lug provided. Tighten the connections and perform the “pull test”. The tightened wires should remain in place after giving the wires a moderate pull to see if they will come loose.

It is recommended that “DE-OX” or another similar anti-oxidation agent be used on all power connections.

VOLTAGE CHECK: Ensure that the power switch is in the OFF position and apply power to the dishmachine. Check the incoming power at the terminal block and ensure it corresponds to the volt- age listed on the data plate. If not, contact a qualified service agency to examine the problem. Do not run the dishmachine if the voltage is too high or too low. Shut off the service breaker and mark it as being for the dishmachine. Advise all proper personnel of any problems and of the location of the service breaker. Replace the control box cover and tighten down the screws.

2

Image 4
Contents Technical Manual Table of Contents Specifications of the Tempstar GP Installation Instructions GAS Connection Operation Instructions Overview of Operation Overview of Operation Thermostat Adjustment Procedure AUTO-CALIBRATION Procedure Auto CalibrationTesting and Setting the Set Point Temperature Electronics Control Board ECBTesting the Thermistors To test the temperature at the T-in ThermistorControl Board LED Light Indications Green LED is offTroubleshooting Section Symptom Possible Cause ActionTroubleshooting Section Leaks do not USE Flame Low rinse temperature/low wash Low inlet water temperature Polarity will Damage the Circuit Boards DSICombination cutoff valve and the modulating Check ignition wire. Check that lights above Dimensions Table Dimensions Main Assembly Shown Not ShownControl BOX Assembly Front View QTY Description MFG noControl BOX Assembly TOP View Control BOX ASSEMBLY-TOP View Hood Assembly Cantilever ARM Assembly TUB Assembly Back of TUB, & Drain Assembly Lower Assembly Right Side Incoming Plumbing Assembly Incoming Plumbing Parts Lists GAS Pack Assembly Upper WASH, & Rinse ARM Assembly Lower WASH, & Rinse ARM Assembly Steam Coil Assembly Steam Coil Assembly Parts Lists Rinse Tank Assembly Electronic Control Drawer Components RED Green LEDElectrical Diagram 208/240 Volt 60 Hertz 1 Phase