GE ZGU385N, ZGU385L Installation Options, ″ gap 23-5/16″total flat surface required at center

Page 12

Installation Options

COOKTOP INSTALLATION WITH A

36MONOGRAM DOWNDRAFT VENT,

MODEL ZVB36

The installation of the downdraft vent with this cooktop requires careful consideration. Both the cooktop and the vent must be installed according to each specific installation instruction.

COOKTOP REQUIREMENTS

The countertop must have a deep flat surface to accommodate the cooktop and vent. Countertops with a rolled front edge and backsplash will not provide the flat surface area required.

Review the illustration to determine the countertop surface requirements.

All cutout clearances for this installation must be observed.

36-3/4

3/8

21-11/16

cutout

depth34cooktop and vent area cutout

7/16cooktop overlap (1-1/4at center)

3/8

1/8gap

23-5/16total flat surface required at center

3-3/8min. cooktop cutout to rear vertical combustible surface

Front edge of countertop 2-1/2min. clearance

to cutout

12min. cutout to

wall, both sides

BASE CABINET REQUIREMENTS

The combined installation will fit in a standard 24deep base cabinet. Use a 36or wider base cabinet.

The vent housing, blower and ductwork will occupy the base cabinet.

POWER SUPPLY

If local codes permit, the vent and cooktop may operate from the same 120V, 15 amp duplex outlet. Locate the gas and electrical supply as shown on page 8.

12

Image 12
Contents Questions? Call 800.GE.CARES La section française commence à laSafety Information For Your SafetyBefore YOU Begin What to do if YOU Smell GASContents Electrical RequirementsInstallation Preparation Tools YOU will Need For InstallationModels Available Parts IncludedInstallation Options Cooktop and ZVB36 Downdraft Vent Combination InstallationInstallation Above Cabinet Drawers Advance PlanningPRE-INSTALLATION Checklist Dimensions and Clearances Power Supply Locations Optional Combination InstallationsGas supply Electrical supplyInstallation Instructions Install the CooktopInstall Pressure Regulator Connect ElectricalAssemble BURNERS, Check Ignition Check ignitersOperation Checklist ″ toBurners should be checked frequently EdgesInstallation Options ″ gap 23-5/16″total flat surface required at center4 ″ Dim. aZTD910 28-1/2″ ZKD910 25-1/2″ Model ZET1 or ZET938 Oven requires a separate, properly grounded36″ ″ min. countertop Height 28-5/8″max 23-1/2″minSafety Information Adjust the RegulatorTools YOU will Need for Conversion Change Burner OrificesAdjust Burner Flames Convert LP Gas Model ZGU385LSMSS to Natural Gas Operation Installation Instructions for LP to Natural Gas Conversion Information de la sécurité Avant DE CommencerPour Votre Sécurité CI QUE Vous Devez Faire SI Voussentez LE GAZInformation de la sécurité Avertissement Débranchez Besoins D’ÉLECTRICITÉContenu Préparation à l’installation Modèles DisponiblesPièces Comprises Matériaux Dont Vous Pourriez Avoir BesoinOptions D’INSTALLATION Installation de la combinaison four simple ZET1 ou ZET938Installation au-dessus des tiroirs des armoires Planification AvancéeListe DE Vérification DE PRÉ-INSTALLATION EmballageCollé sur la face MousseDimensions ET Dégagements Emplacements DE L’ALIMENTATION DE GAZ Installations de combinaison en optionAlimentation de gaz 30,5 cm 12 poInstructions d’installation Installez LE Régulateur DE Pression suiteAvertissement ne réutilisez Avertissement n’utilisezAvertissement allumer Vérifiez les allumeursListe DE Vérification Brûleur de la Mm surface de cuisson 1/4 poLes brûleurs doivent être régulièrement vérifiés Options d’installation Surface DE CUISSON-SPÉCIFICATIONS D’INSTALLATIONDim. a 30 PO, Modèle ZET1 OU ZET938 Renseignements SUR LA Sécurité Outils Nécessaires Pour LA ConversionChangez LES Orifices DES Brûleurs EncolureAjustez LA Flamme DU Brûleur Que sa position initialePlus la valve qu’à sa position initiale Tester la stabilité de la flammeConvertir le modèle du gaz PL ZGU385LSMSS au gaz naturel Ajustez LA Flamme DU Brûleur GE Consumer & Industrial