GE ZGU385N Installation Preparation, Models Available, Parts Included, Materials YOU MAY Need

Page 4

Installation Preparation

MODELS AVAILABLE

ZGU385N

36natural gas cooktop

ZGU385L

36LP gas cooktop

These models are factory set for either natural gas or LP gas operation. Be sure to order the correct model for the installation situation.

PARTS INCLUDED

2 Screws

Regulator

2 Hold

Down Brackets

MATERIALS YOU MAY NEED

Joint

 

Pipe Fittings

Shut Off

Sealant

 

 

 

Valve

 

 

 

 

 

 

 

 

 

 

CSA-Approved Flexible Gas Line

1/2Min. ID, 1/2NPT Connection,

3-foot Maximum Length (Massachusetts Only)

NOTE: Purchase new line, do not use

previously used flexible gas line.

TOOLS YOU WILL NEED

FOR INSTALLATION

Pencil

Saber Saw

Phillips Head

Screwdriver

Pipe Wrench

Ruler or

Straightedge

 

1/8Drill Bit &

 

Electric or Hand

Safety Glasses

Drill

 

4

Image 4
Contents Questions? Call 800.GE.CARES La section française commence à laSafety Information For Your SafetyBefore YOU Begin What to do if YOU Smell GASContents Electrical RequirementsInstallation Preparation Tools YOU will Need For InstallationModels Available Parts IncludedInstallation Options Cooktop and ZVB36 Downdraft Vent Combination InstallationInstallation Above Cabinet Drawers Advance PlanningPRE-INSTALLATION Checklist Dimensions and Clearances Power Supply Locations Optional Combination InstallationsGas supply Electrical supplyInstallation Instructions Install the CooktopInstall Pressure Regulator Connect ElectricalAssemble BURNERS, Check Ignition Check ignitersOperation Checklist ″ toBurners should be checked frequently EdgesInstallation Options ″ gap 23-5/16″total flat surface required at centerDim. a 4 ″ZTD910 28-1/2″ ZKD910 25-1/2″ Model ZET1 or ZET938 Oven requires a separate, properly grounded36″ ″ min. countertop Height 28-5/8″max 23-1/2″minSafety Information Adjust the RegulatorTools YOU will Need for Conversion Change Burner OrificesAdjust Burner Flames Convert LP Gas Model ZGU385LSMSS to Natural Gas Operation Installation Instructions for LP to Natural Gas Conversion Information de la sécurité Avant DE CommencerPour Votre Sécurité CI QUE Vous Devez Faire SI Voussentez LE GAZBesoins D’ÉLECTRICITÉ Information de la sécurité Avertissement DébranchezContenu Préparation à l’installation Modèles DisponiblesPièces Comprises Matériaux Dont Vous Pourriez Avoir BesoinOptions D’INSTALLATION Installation de la combinaison four simple ZET1 ou ZET938Installation au-dessus des tiroirs des armoires Planification AvancéeListe DE Vérification DE PRÉ-INSTALLATION EmballageCollé sur la face MousseDimensions ET Dégagements Emplacements DE L’ALIMENTATION DE GAZ Installations de combinaison en optionAlimentation de gaz 30,5 cm 12 poInstructions d’installation Installez LE Régulateur DE Pression suiteAvertissement ne réutilisez Avertissement n’utilisezAvertissement allumer Vérifiez les allumeursBrûleur de la Mm surface de cuisson 1/4 po Liste DE VérificationLes brûleurs doivent être régulièrement vérifiés Options d’installation Surface DE CUISSON-SPÉCIFICATIONS D’INSTALLATIONDim. a 30 PO, Modèle ZET1 OU ZET938 Renseignements SUR LA Sécurité Outils Nécessaires Pour LA ConversionChangez LES Orifices DES Brûleurs EncolureAjustez LA Flamme DU Brûleur Que sa position initialePlus la valve qu’à sa position initiale Tester la stabilité de la flammeConvertir le modèle du gaz PL ZGU385LSMSS au gaz naturel Ajustez LA Flamme DU Brûleur GE Consumer & Industrial