Installation Preparation

ADVANCE PLANNING

Refer to “Installation Preparation” for information on appropriate placement and necessary clearances when planning installation.

Avoid placing cabinetry directly above cooktop when possible.

If cabinetry is used above cooking surface:

Use cabinets no more than 13deep.

Maintain 30minimum clearance between cooktop and unprotected cabinets directly above cooktop.

If clearance is less than 30, protect cabinet bottoms with flame-retardant millboard at least 1/4thick, or gypsum board at least 3/16thick, covered with 28 gauge sheet steel or .02thick copper.

Clearance between cooktop and protected cabinetry must not be less than 24.

An exhaust hood that projects at least 5beyond front of cabinets can reduce risk of burns caused by reaching over heated surface units.

Working areas adjacent to the cooktop should have 18minimum clearance between countertop and cabinet bottom.

A 36or wider exhaust hood with 350 CFM or greater airflow rating is recommended for use over this Monogram cooktop.

Installation must conform with local codes.

In the absence of local codes, the gas cooktop must comply with the National Fuel Gas Code, ANSI Z223.1, latest edition.

Gas supply should be located near the opening for this cooktop (see Preparing the Opening and Gas Connection sections of this manual). The supply should provide natural gas at 7of water column pressure (11of water column for LP gas) and a maximum of 14of water column for natural or LP gas.

The electric spark ignition feature for this model requires a 120V electrical power supply be located in the immediate vicinity of this cooktop (see Electrical Connections section of this manual).

WB28T10185 High Altitude Kit

For operation above 5,000 feet, order WB28T10185 Conversion Kit. This kit includes orifices for both LP and Natural gas operation.

INSTALLATION OPTIONS

Cooktop and ZVB36 Downdraft Vent Combination Installation

These cooktops may be installed with a 36Monogram Downdraft Vent, model ZVB36. See page 12 for cutout and clearances.

The countertop must have a deep flat surface to accommodate the combined installation of the cooktop and vent.

The downdraft vent with blower, motor and ductwork will occupy the base cabinet.

Consideration must be given to electrical and gas supply locations. See page 8.

Cooktop and ZTD910 or ZKD910 Warming Drawer Combination Installation

These cooktops may be installed over a Monogram 30or 27Warming Drawer, model ZTD910 or ZKD910. See page 13 for cutout and clearances.

Consideration must be given to electrical and gas supply locations. See page 8.

Cooktop and ZET1 or ZET938 Single Oven Combination Installation

These cooktops may be installed over a Monogram 30Oven, model ZET1 or ZET938. See page 14 for cutout and clearances.

Consideration must be given to electrical and gas supply locations. See page 8.

Installation Above Cabinet Drawers

When installing the cooktop above a base cabinet with drawers, it may be necessary to use a shorter depth (front to back) drawer to allow clearance for the gas connection.

5

Image 5
Contents La section française commence à la Questions? Call 800.GE.CARESFor Your Safety Safety InformationBefore YOU Begin What to do if YOU Smell GASElectrical Requirements ContentsTools YOU will Need For Installation Installation PreparationModels Available Parts IncludedCooktop and ZVB36 Downdraft Vent Combination Installation Installation OptionsInstallation Above Cabinet Drawers Advance PlanningPRE-INSTALLATION Checklist Dimensions and Clearances Optional Combination Installations Power Supply LocationsGas supply Electrical supplyInstall the Cooktop Installation InstructionsInstall Pressure Regulator Connect ElectricalCheck igniters Assemble BURNERS, Check Ignition″ to Operation ChecklistBurners should be checked frequently Edges″ gap 23-5/16″total flat surface required at center Installation OptionsZTD910 28-1/2″ ZKD910 25-1/2″ 4 ″Dim. a Oven requires a separate, properly grounded Model ZET1 or ZET93836″ ″ min. countertop Height 28-5/8″max 23-1/2″minAdjust the Regulator Safety InformationTools YOU will Need for Conversion Change Burner OrificesAdjust Burner Flames Convert LP Gas Model ZGU385LSMSS to Natural Gas Operation Installation Instructions for LP to Natural Gas Conversion Avant DE Commencer Information de la sécuritéPour Votre Sécurité CI QUE Vous Devez Faire SI Voussentez LE GAZContenu Information de la sécurité Avertissement DébranchezBesoins D’ÉLECTRICITÉ Modèles Disponibles Préparation à l’installationPièces Comprises Matériaux Dont Vous Pourriez Avoir BesoinInstallation de la combinaison four simple ZET1 ou ZET938 Options D’INSTALLATIONInstallation au-dessus des tiroirs des armoires Planification AvancéeEmballage Liste DE Vérification DE PRÉ-INSTALLATIONCollé sur la face MousseDimensions ET Dégagements Installations de combinaison en option Emplacements DE L’ALIMENTATION DE GAZAlimentation de gaz 30,5 cm 12 poInstallez LE Régulateur DE Pression suite Instructions d’installationAvertissement ne réutilisez Avertissement n’utilisezVérifiez les allumeurs Avertissement allumerLes brûleurs doivent être régulièrement vérifiés Liste DE VérificationBrûleur de la Mm surface de cuisson 1/4 po Surface DE CUISSON-SPÉCIFICATIONS D’INSTALLATION Options d’installationDim. a 30 PO, Modèle ZET1 OU ZET938 Outils Nécessaires Pour LA Conversion Renseignements SUR LA SécuritéChangez LES Orifices DES Brûleurs EncolureQue sa position initiale Ajustez LA Flamme DU BrûleurPlus la valve qu’à sa position initiale Tester la stabilité de la flammeConvertir le modèle du gaz PL ZGU385LSMSS au gaz naturel Ajustez LA Flamme DU Brûleur GE Consumer & Industrial