GE ZGU385L, ZGU385N installation instructions 4 ″, Dim. a, ZTD910 28-1/2″ ZKD910 25-1/2″

Page 13

Installation Options

COOKTOP INSTALLATION OVER A MONOGRAM WARMING DRAWER, MODEL ZTD910 OR ZKD910

These cooktops may be installed over a 30or 27Warming Drawer. Both the cooktop and

the warming drawer must be installed according to each specific installation instruction.

POWER SUPPLY:

If local codes permit, the cooktop and warming drawer may operate from the same 120V duplex outlet. Refer to installation instructions for details.

Install 2x4 or 2x2 anti-tip block against rear cabinet wall 9from cutout floor to bottom of block

Cooktop 33-7/8

19-1/8

1-1/2cabinet top

25

2-1/2min.

9

23-1/2min.

Use a 36or wider base cabinet.

Plan gas supply location carefully to avoid interference with the warming drawer.

 

5-1/2min.

 

 

 

36

 

9-1/4

countertop

A

height

 

 

 

Dim. A

ZTD910 28-1/2

ZKD910 25-1/2

NOTE: When installing a Monogram Warming Drawer below a cooktop, a solid barrier must be installed at least 1from the lowest point of the bottom of cooktop burner box to the top of cutout. See Warming Drawer Installation Instructions for details.

13

Image 13
Contents La section française commence à la Questions? Call 800.GE.CARESFor Your Safety Safety InformationBefore YOU Begin What to do if YOU Smell GASElectrical Requirements ContentsTools YOU will Need For Installation Installation PreparationModels Available Parts IncludedCooktop and ZVB36 Downdraft Vent Combination Installation Installation OptionsInstallation Above Cabinet Drawers Advance PlanningPRE-INSTALLATION Checklist Dimensions and Clearances Optional Combination Installations Power Supply LocationsGas supply Electrical supplyInstall the Cooktop Installation InstructionsInstall Pressure Regulator Connect ElectricalCheck igniters Assemble BURNERS, Check Ignition″ to Operation ChecklistBurners should be checked frequently Edges″ gap 23-5/16″total flat surface required at center Installation OptionsDim. a 4 ″ZTD910 28-1/2″ ZKD910 25-1/2″ Oven requires a separate, properly grounded Model ZET1 or ZET93836″ ″ min. countertop Height 28-5/8″max 23-1/2″minAdjust the Regulator Safety InformationTools YOU will Need for Conversion Change Burner OrificesAdjust Burner Flames Convert LP Gas Model ZGU385LSMSS to Natural Gas Operation Installation Instructions for LP to Natural Gas Conversion Avant DE Commencer Information de la sécuritéPour Votre Sécurité CI QUE Vous Devez Faire SI Voussentez LE GAZBesoins D’ÉLECTRICITÉ Information de la sécurité Avertissement DébranchezContenu Modèles Disponibles Préparation à l’installationPièces Comprises Matériaux Dont Vous Pourriez Avoir BesoinInstallation de la combinaison four simple ZET1 ou ZET938 Options D’INSTALLATIONInstallation au-dessus des tiroirs des armoires Planification AvancéeEmballage Liste DE Vérification DE PRÉ-INSTALLATIONCollé sur la face MousseDimensions ET Dégagements Installations de combinaison en option Emplacements DE L’ALIMENTATION DE GAZAlimentation de gaz 30,5 cm 12 poInstallez LE Régulateur DE Pression suite Instructions d’installationAvertissement ne réutilisez Avertissement n’utilisezVérifiez les allumeurs Avertissement allumerBrûleur de la Mm surface de cuisson 1/4 po Liste DE VérificationLes brûleurs doivent être régulièrement vérifiés Surface DE CUISSON-SPÉCIFICATIONS D’INSTALLATION Options d’installationDim. a 30 PO, Modèle ZET1 OU ZET938 Outils Nécessaires Pour LA Conversion Renseignements SUR LA SécuritéChangez LES Orifices DES Brûleurs EncolureQue sa position initiale Ajustez LA Flamme DU BrûleurPlus la valve qu’à sa position initiale Tester la stabilité de la flammeConvertir le modèle du gaz PL ZGU385LSMSS au gaz naturel Ajustez LA Flamme DU Brûleur GE Consumer & Industrial