|
|
| |
| Table of Contents | ||
| WARNING |
| 4 |
| Safety Precautions for Liquid Nitrogen | 4 | |
GENERAL INFORMATION | 6 | ||
| Text Format Notation | 6 | |
| LABS Cryostorage Specifications | 7 | |
INSTALLATION | 9 | ||
| Unpacking and Inspection | 9 | |
| Liquid Nitrogen Supply Connection | 9 | |
| Power Supply Connection | 10 | |
| KRYOS Control Field Installation | 10 | |
OPERATION | 11 | ||
| Initial Fill | 11 | |
| Control Components | 12 | |
| Operating Parameters | 14 | |
| Adding an Inventory Control System | 15 | |
| Control Operation | 20 | |
| Control On Battery Backup Version | 31 | |
Solenoid Valve | 31 | ||
INTERFACE SOFTWARE | 32 | ||
MAINTENANCE | 33 | ||
| Strainer Cleaning Instructions | 33 | |
| Defrosting Your | 33 | |
| Cleaning Your | 34 | |
| Making Adjustments to the LABS KRYOS Sensor Assembly | 35 | |
| Removing/Installing the Solenoid Valve | 37 | |
| Sensor Plug Schematic | 38 | |
| LABS Plumbing Assembly | 39 | |
TROUBLESHOOTING | 40 | ||
| Symptoms | 40 | |
| Factory Settings | 44 | |
Replacement Parts | 45 |
3