This section provides installation procedures for the 4.5-Meter Andrew Earth Station Antenna. The installation procedures include instructions on the following antenna com- ponents.

Mount

Reflector

Back Structure

Reflector To Mount Assembly

Subreflector

Feed System

Note: All installation instructions for the antenna options are contained in the parts kit included in the shipment.

Before beginning the installation process on the ground mount assembly, ensure that the foundation has been prepared. Foundation specifications are provided by Andrew and may be used as a reference by civil engineering personnel when preparing the foundation for local soil conditions. These specifications are available before the ship- ment arrives by contacting the Customer Service Center.

Sweep foundation clean of any dirt or debris.

To ensure level, smooth surface for mount, remove excess concrete from shear caps and anchor bolts as shown in Figure 1.

Figure 1

11

Installation Procedures

Image 11
Contents Meter ESA Table of Contents Introduction IntroductionProprietary Data Information Assistance Technical Customer Service CenterOverview Content How to Use This ManualGetting Started OverviewTool Size Qty Recommended ToolsGetting Started Main Reflector Assembly Getting Started Overview Foundation Preparation Installation ProceduresA-325 Tensioning Tensioning StepTripod Mount Step 300747 Step Upper Step Step Step Step Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step Step ES45T-R Reflector Assembly Reflector Leveling Procedure Step ES45T-R Reflector Assembly ES45T-R Reflector Assembly Step Feed Strut Assembly ES45T-R Reflector Assembly ES45T-R-1 Back Structure ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step Installation Procedures ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step Installation Procedures ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step Installation Procedures ES45T-R Reflector Assembly Step Feed Support Assembly Step ES45T-T Reflector Assembly ES45T-T-1 Reflector Step ES45T-T Reflector Assembly Step Top Match Markings Reflector Segment Top Match Markings Capscrew Hardware 49693 Joining Plate ES45T-T Reflector Assembly Step ES45T-T Reflector Assembly Step Reflector Leveling Procedure Line of Sight Steel Rule Elevation Reflector X 1-1/2 ES45T-T Reflector Assembly Step Feed Strut Assembly ES45T-T Reflector Assembly ES45T-T-1 Back Structure Step ES45T-T Reflector Assembly Step Installation Procedures ES45T-T Reflector Assembly Step ES45T-T Reflector Assembly Step Installation Procedures ES45T-T Reflector Assembly Step ES45T-T Reflector Assembly Step Installation Procedures ES45T-T Reflector Assembly Step Step Feed Support/Strut Assembly Polarization Adjustment Step Medium Modular Mount Operation Overview Acquiring a Satellite StepStep Step Step Manual Actuator Assembly Removal Step Preventive Maintenance Overview General Cleaning Electrical PartsPreventive Maintenance Antenna Preventive Maintenance Drive System Voltage Current Checks Step Step Pedestal Mount Bearing Pad Adjustment Preventive Maintenance Jackscrews/Motors Gear Motor/Housing Fill Drain Requirements Antenna Lubrication Chart