Andrew manual ES45T-T Reflector Assembly ES45T-T-1 Reflector Step

Page 46

ES45T-T Reflector Assembly

ES45T-T-1 Reflector

Step 1

Step 2

The ES45T-T-1 reflector is composed of six precision-formed panels designed for accu- rate strength, and ensures a reliable surface contour that provides exceptional operating characteristics in C-, X- or Ku-frequency bands.

Reflector should be assembled on a clear, flat area in front of the foundation pad. Clear debris from area and place plastic sheeting from packing crate as shown in Figure 56.

Arrange diameter setting band assembly (P/N 49612) and temporary supports as shown in Figure 54.

Tighten ¼-20 hardware at center connection until snug

Reflector should be assembled in front of foundation pad with bottom of reflector 3 ft. from pad

Temporary supports should be 6-8 in. high

Tie three string levels to opposing blocks across diameter of circle

Adjust supports with shims until strings are level and lightly touch at center of circle

Once supports are level, remove strings

Move supports 12 in. radially away from circle, carefully maintaining orientation and height for later reuse

Figure 54

46

Installation Procedures

Image 46
Contents Meter ESA Table of Contents Introduction IntroductionCustomer Service Center Proprietary Data Information Assistance TechnicalHow to Use This Manual Overview ContentOverview Getting StartedRecommended Tools Tool Size QtyGetting Started Main Reflector Assembly Getting Started Installation Procedures Overview Foundation PreparationTensioning Step A-325 TensioningTripod Mount Step 300747 Step Upper Step Step Step Step Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step Step ES45T-R Reflector Assembly Reflector Leveling Procedure Step ES45T-R Reflector Assembly ES45T-R Reflector Assembly Step Feed Strut Assembly ES45T-R Reflector Assembly ES45T-R-1 Back Structure ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step Installation Procedures ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step Installation Procedures ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step ES45T-R Reflector Assembly Step Installation Procedures ES45T-R Reflector Assembly Step Feed Support Assembly Step ES45T-T Reflector Assembly ES45T-T-1 Reflector Step ES45T-T Reflector Assembly Step Top Match Markings Reflector Segment Top Match Markings Capscrew Hardware 49693 Joining Plate ES45T-T Reflector Assembly Step ES45T-T Reflector Assembly Step Reflector Leveling Procedure Line of Sight Steel Rule Elevation Reflector X 1-1/2 ES45T-T Reflector Assembly Step Feed Strut Assembly ES45T-T Reflector Assembly ES45T-T-1 Back Structure Step ES45T-T Reflector Assembly Step Installation Procedures ES45T-T Reflector Assembly Step ES45T-T Reflector Assembly Step Installation Procedures ES45T-T Reflector Assembly Step ES45T-T Reflector Assembly Step Installation Procedures ES45T-T Reflector Assembly Step Step Feed Support/Strut Assembly Polarization Adjustment Step Medium Modular Mount Overview Acquiring a Satellite Step OperationStep Step Step Manual Actuator Assembly Removal Step Overview General Cleaning Electrical Parts Preventive MaintenancePreventive Maintenance Antenna Preventive Maintenance Drive System Voltage Current Checks Step Step Pedestal Mount Bearing Pad Adjustment Preventive Maintenance Jackscrews/Motors Gear Motor/Housing Fill Drain Requirements Antenna Lubrication Chart