ES45T-R Reflector Assembly
Step 9
Step 10
Step 11
Step 12
Step 13
Feed Strut Assembly
Step 1
Step 2
Shim each location as required to level the reflector (see Figure 31).
Continue to measure around antenna again, recording the height of each location mea- sured. As before, shim the low location points to be at the same elevation as the highest measured location.
Continue to measure, record, compare and shim any low temporary support location points until all (6) temporary location points are within 0.030 inches [0.75 mm] elevation from each other.
Recheck the shim stacks required for leveling the reflector to ensure they are properly positioned and are adequately supporting the reflector. Note: As work continues on the reflector it is essential that the shim stacks remain in position through out this process. Also ensure that diameter setting bands are taut and evenly tensioned. If not, check to ensure proper leveling of temporary supports.
With the reflector level, tighten joining plate (P/N 49425) hardware starting at the outer perimeter of match marked position
Figure 32
Installer underneath reflector should attach four of each feed strut brackets (P/N 49694/49695) as shown in Figure 32.
•Use
•Insert bolts from concave sides of reflector
Pass feed struts (P/N 49703) to installer underneath for attachment to feed strut brackets (P/N 49694/49695).
•Use 3/8 x
•Secure feed struts together after attachment to feed strut brackets as shown in Figure 32
You have now completed the assembly of the