Hearth and Home Technologies 6000BE Venting with Three 3 90 Elbows, Venting with three 90 elbows

Page 19

 

VENTING WITH THREE (3) 90° ELBOWS

 

 

V

 

H

H + H1

 

1´MIN. (305mm)

2´MAX. (610mm)

5´MAX. (1.52m)

 

2´MIN. (610mm)

4´MAX. (1.22m)

10´MAX. (3.1m)

 

3´MIN. (914mm)

6´MAX. (1.86m)

15´MAX. (4.65m)

 

4´MIN. (1.22m)

8´MAX. (2.48m)

20´MAX. (6.2m)

 

V1+V+H+H1

= 40´ MAX.(12.4 m) H = 8´MAX.(2.48 m) H+H1 = 20´MAX.(6.2 m)

 

V1

 

 

 

 

V

 

 

 

 

H1

 

 

 

 

H

 

 

 

 

V

H

 

H + H1 + H2

 

1´MIN. (305mm)

2´MAX. (610mm)

5´MAX. (1.52m)

 

2´MIN. (610mm)

4´MAX. (1.22m)

10´MAX. (3.1m)

 

3´MIN. (914mm)

6´MAX. (1.86m)

15´MAX. (4.65m)

 

4´MIN. (1.22m)

8´MAX. (2.48m)

20´MAX. (6.2m)

Î

V+H+H1+H2 = 40´ MAX. (12.4 m)

H = 8´ MAX. (2.48 m)

H+H1+H2 = 20´ MAX. (6.2 m)

 

 

 

 

 

H2

 

V

 

 

 

 

 

 

H1

 

 

 

 

 

 

H

 

 

Figure 16. Venting with three 90° elbows

 

 

 

 

Hearth & Home Technologies • 6000BE, 6000BE-IPI2024-900 Rev. G • 11/05

19

Image 19
Contents What to do if you smell gas Installation and OperationSafety and Warning Information Table of Contents Log Set Assembly Service PartsGLA-750TR Service Parts List 6000BE, 6000BE-IPIIntermittent Pilot Ignition Valve AssemblyStanding Pilot Ignition 6000BECertification High Altitude InstallationsInstallation Codes Appliance CertificationIntroducing the Hearth & Home Technologies Gas Fireplaces Pre-install PreparationANY Such Action MAY Possibly Cause a Fire Hazard GAS Line Access Diagram of the 6000BE, 6000BE-IPILocating the Fireplace Constructing the Fireplace ChaseClearance Requirements Framing the Fireplace Framing DimensionsDVP90ST Identifying Vent Components Installing the Vent SystemVent System Approvals Tems or Components MAY be UsedVertical Venting Flue Restrictor InstructionsMAX .4 M Straight Up Vertical Venting Chart Venting with One 90 Elbow Venting with ONE 1 90 ElbowVenting with Two 90 Elbows Venting with TWO 2 90 o ElbowsVenting with three 90 elbows Venting with Three 3 90 Elbows+ V 1 FT + H 1 FT Installing Vent Components Above the First 900 Elbow in the Venting System To Install the Heat ShieldInstall Support Brackets Continue Adding Vent Components12 Hole and Vent Pipe Attic Firestop Vent TerminationHorizontal Termination Alcove Applications ServiceProper Positioning Leveling and Securing of a Fireplace Positioning, Leveling, and Securing the FireplaceIntermittent Pilot Ignition IPI System Installing the Optional Heat-Zone Kit Gas Control SystemsVice Must be Wired Directly to the FIRE- Place Junction BOX Standing Pilot Ignition SystemCheck for GAS Leaks Gas Supply LineGas Pressure Requirements Pressure Natural Gas PropaneWall Switch Wiring the FireplaceFor Standing Pilot Ignition Wiring Appliance Requirements Optional AccessoriesBRN Operation using Battery PowerInstalling the Trim Installing Trim, Logs, and Ember MaterialFinishing Positioning the Logs Follow these stepsCover Ports Shutter SettingsPlacing the Ember Material Glass Assembly6000BE Tempered 6000BE-IPI Tempered Cold Climate Switch Double-check for faulty componentsBefore Lighting the Fireplace Important Turn OFF the GAS Before Servicing Your Fireplace After the InstallationFireplace Maintenance Lighting the Fireplace