NOTE: There must be NO INSULATION or other combustibles inside the framed firestop opening.
JOIST |
CEILING |
NAILS (4 REQUIRED) |
CEILING FIRESTOP |
Figure 26. Ceiling Firestop (Ceiling Side) |
If the area above the ceiling IS an attic, position and secure the firestop on top of the previously framed hole.
NOTE: Keep insulation away from the vent pipe at least 1 inch (25mm).
| NAILS (4 REQUIRED) |
| RAFTER |
CEILING |
|
| CEILING FIRESTOP |
Figure 27. | Attic Firestop |
C. Vent Termination
Refer to Cinch Pipe and Termination Cap installation in- structions.
Horizontal Termination
•The termination kit should pass through the wall firestops from the exterior of the building.
•Adjust the termination cap to its final exterior position on the building and interlock the flue sections.
WARNING: THE TERMINATION CAP MUST BE
!POSITIONED SO THAT THE ARROW IS POINT- ING UP.
!WARNING: VENTING TERMINALS SHALL NOT BE RECESSED INTO A WALL OR SID-
ING. VENT TERMINATION CLEARANCES MUST BE FOLLOWED TO AVOID FIRE DANGER. SEE VENT TERMINATION MINIMUM CLEARANCES DI- AGRAM ON FOLLOWING PAGE.
7 1/4”
(184mm)
Figure 28. Trapezoid Termination Cap
24 | Hearth & Home Technologies • 6000BE, |