Broan HEPA 4000, HEPA 3000, HEPA 2000, HEPA 1000 installation instructions Dimensions CONT’D

Page 16

3. DIMENSIONS (CONT’D)

3.3MOUNTING AND SERVICING CONSIDERATIONS

The two following pictures are showing the minimum clearance needed to open the door completely.

8”

 

(203 mm)

 

22.5”

15.75”

(572 mm)

(400 mm)

VD0117

 

22”

(559 mm)

VD0116

NOTE: A minimum of 8” (203 mm) clearance from any obstruction on top of the unit is required for the ductwork radius turn.

The joist opening needed to install the Tandem® tansition must be 9 3/4” (248 mm) minimum. Also, the maximum height of the Tandem® transition is 8 3/4” (222 mm). See Tandem® transition end view below.

9 3/4"

248 mm

8 3/4"

222 mm

VD0118

- 16 -

Image 16
Contents Installation Instructions About this Manual About These Units Table of Contents Table DES Matières Typical Installations Before StartingTypical Installations CONT’D Hepa 1000 and HF 1.0 Unit Installations CONT’D RETURN-RETURN Installation Connection to a Forced AIR System Hepa 4000 Restricted Area VH0051 Hepa 2000, HF 2.0, Hepa 3000, HF 3.0 and Hepa Hepa 2000, HF 2.0, Hepa 3000, HF 3.0 and Hepa 4000 Unit VH0043 Dimensions Front View TOP ViewDimensions CONT’D Install the Unit Install the Unit CONT’D HOW to Hang the Unit CONT’D Stale air exhaust ductwork Stale air ductwork Filtered air ductwork Return side connection cont’d Hepa 2000, HF2.0, Hepa 3000, HF 3.0 and Hepa 4000 Units only Pull back the insulation to expose the flexible duct 457 mm Xmas tree pin Connecting the Drain Hepa 3000 and HF 3.0 Units only Controls NORMAL/REMOTEControls CONT’D Controls C12 / CM and C34 / CMRControls C12 / CM and C34 / CMR CONT’D VD0088 Is on Normal or Boost Using C34 / CMR Control Maintenance Maintenance CONT’D For Hepa 2000 and HF 2.0 onlyMaster Reset C12 / CM and C34 / CMR Controls Parts Ordering Chart Troubleshooting Problems Solutions