PB Heat manual Repair Parts Series 211A, Description Part Selection Information Stock Code

Page 54

REPAIR PARTS – SERIES 211A

15. REPAIR PARTS – SERIES 211A

Repair parts are available from your installer or by contacting PB Heat, LLC, New Berlinville, PA. Use the Figures and Tables on Pages 52-55 to assist in ordering parts.

Note: Remember to include boiler model number and serial number when ordering parts.

Item

No.

Description

Part Selection Information

Stock

Code

1

Intermediate Section

50 psig (345 kPa) Working Pressure

90356

 

 

 

 

2

Left Hand End Section

50 psig (345 kPa) Working Pressure

90625

 

 

 

 

3

Right Hand End Section

50 psig (345 kPa) Working Pressure

90059

 

 

 

 

4

Tapped Intermediate Section

50 psig (345 kPa) Working Pressure

90065

 

 

 

 

5

Tie Rod

2 Required Per Flueway

90090

 

 

 

 

6

Flow Port Gasket

2 Required Per Flueway

51670

 

 

 

 

7

Hi Temp Rope for Sections, 5/8" (16mm)

6-1/2 Feet (2 Meter) Required Per Flueway

55723

 

 

 

 

8

Base Right End Panel w/Insulation

1 Required Per Boiler

GG2112

 

 

 

Base Left End Panel w/Insulation

1 Required Per Boiler

GG2113

 

 

 

 

 

 

 

16-7/8" (429 mm) Wide

GG2080

 

 

 

 

 

 

22-1/2" (571 mm) Wide

GG2080-1

 

 

 

 

9

Base Front Panel Sub-Assembly w/Insulation

28-1/8" (714 mm) Wide

GG2080-2

 

 

 

 

 

 

33-3/4" (857 mm) Wide

GG2080-3

 

 

 

 

 

 

39-3/8"(1 m) Wide

GG2080-4

 

 

 

 

 

 

16-7/8" (429 mm) Wide

GG2081

 

 

 

 

 

 

22-1/2" (571 mm) Wide

GG2081-1

 

 

 

 

10

Base Back Panel Sub-Assembly w/Insulation

28-1/8" (714 mm) Wide

GG2081-2

 

 

 

 

 

 

33-3/4" (857 mm) Wide

GG2081-3

 

 

 

 

 

 

39-3/8" (1 m) Wide

GG2081-4

 

 

 

 

 

 

For 16-7/8" (429 mm) Wide Panel

50848

 

 

 

 

 

 

For 22-1/2" (571 mm) Wide Panel

50849

 

 

 

 

11

Base Front or Back Panel Insulation

For 28-1/8" (714 mm) Wide Panel

50850

 

 

 

 

 

 

For 33-3/4" (857 mm) Wide Panel

50851

 

 

 

 

 

 

For 39-3/8" (1 m) Wide Panel

50852

 

 

 

 

12

Base Left/Right End Panel Insulation

1 Required Per Panel

50853

 

 

 

 

13

Insulation Fastener

Specify Quantity Required

GG2104

14

Burner Support Channel Clip

2 Required Per Boiler

90590

 

 

 

 

 

 

For 16-7/8" (429 mm) Wide Base Panel

90585

 

 

 

 

 

 

For 22-1/2" (571 mm) Wide Base Panel

90586

 

 

 

 

15

Burner Support Channel

For 28-1/8" (714 mm) Wide Base Panel

90587

 

 

 

 

 

 

For 33-3/4" (857 mm) Wide Base Panel

90588

 

 

 

 

 

 

For 39-3/8"(1 m) Wide Base Panel

90589

 

 

 

 

16

Angle Tie Brace

Specify Quantity Required

90326

 

 

 

 

52

Image 54
Contents Series 211A Table of Contents Controls Using this ManualFollow the Piping Guidelines Special Attention BoxesCombustible Construction Clearances PreinstallationAccessibility Clearances AIR for Combustion and VentilationRequired Volume other = Required Volume fan = 15 ft21 ft Btu/hr 22 cm 2 per 2000 W of total rated Input for all appliances in the space. SeeMechanical Combustion Air Supply Chimney or VentWhere Combustion Air DuctsExterior Vents Vent SizingCombined vent breeching Boiler Setting Installation SurveyWater Quality and MAKE-UP Boiler Foundation Layout Base Assembly Assemble the BaseCrate Items Install the Pilot Burners For 211A-04 through 211A-08 OnlyBase Front and Back Panel Crates Model Overall LengthTypical Gas Manifold and Pilot Line Assembly Total Natural Gas Only Propane Gas Only Model Number PilotsBurners Place the Boiler Sections PreparationPlacing the Sections Assembling Sections on Base Hydrostatic Test the Boiler Align Sections VerticallyInstall the Flue Collector Do not tighten yetBoiler Position Pipe the Boiler Supply PipingReturn Piping Pipe the Boiler Equalizers Multiple Boiler InstallationsBoiler Header End Risers Model SizePiping Multiple Boilers, Typical, Gravity Return Systems Prepare the Parts Install the Jacket & Draft HoodApply Cleanout Cover Plates Apply Jacket END AssembliesApply Lower END Panels Apply Jacket TOP PanelsApply Plates and Labels Top Panel GG-6024 Carton Contents Sub-Assembly Part Number Quantity Jacket Assembly Sequence Carton Numbers and Locations 13C Connect GAS Piping Install GAS TrainInstall Vent and Bleed Piping Connect Pilot GAS TubingInstall GAS Supply Piping Test GAS Supply PipingPipe Length 4 Pipe 2 Pipe Specific Gravity Multiply Capacity byInstall Blowdown Valves Install Controls and TrimInstall Safety Valves Install LOW Water CUT-OFFS Install Pressure ControlsPressure Control Piping Fittings Included with Boiler Standard Float Type COntrol, Model 67PE2 Optional Float Type Pump Control/Low Water Cut-Off, Model Application of 51 Feeders Install Control Wiring Wire the BoilerConnect Supply Wiring Prepare Remaining ControlsTypical Wiring Standard Controls Low Voltage Gas Valves Typical Wiring Standard Controls 120-Volt Gas Valves Starting the Boiler Clean the Boiler Check Boiler ControlsMeter reading. Rate, Btu/Hr = F x H x Lighting Instructions Typical To Light the Boiler To Shut Down the BoilerPilot Flame Failure Operation & Maintenance Placing Boiler in Operation Pilot and Burner FlamesWeekly Maintenance Monthly MaintenanceAnnual Maintenance Daily MaintenanceTroubleshooting Service Tips Problem Possible Cause Suggested RemedyCorrect Piping Boiler Ratings & Dimensions Boiler Rating InformationBoiler Ratings & Dimensions Chart continues on Series 211A Steam Boiler DimensionsSeries 211A Steam Boiler Dimensions Repair Parts Series 211A Description Part Selection Information Stock CodeBase Front Panel Cover Plate 26 660 mm Wide Base Panel Boiler Assembly Base Assembly Page Series 211A