PB Heat 211A Install the Jacket & Draft Hood, Prepare the Parts, Apply Cleanout Cover Plates

Page 25

INSTALL THE JACKET & DRAFT HOOD

6. INSTALL THE JACKET & DRAFT HOOD

A.PREPARE THE PARTS

1.Collect the Jacket cartons and Draft Hood cartons (numbers 12 and 13).

2.See Figure 6.2 for the Jacket Assembly. Use these drawings for part identification and location.

3.See Figure 6.3 for the quantity of each carton required and placement of the jacket sections on the boiler.

4.See Table 6.1 for the contents of each Jacket Carton and Draft Hood carton.

5.See Table 6.2 for the Draft Hood cartons required.

B.APPLY CLEANOUT COVER PLATES

1.Remove Cleanout Cover Plates from carton 12.

2.Install one cover plate on each End Section. Use four 5/16"-18 x 2" (51 mm) long studs, 5/16-18" hex nuts and 5/16" flat washers.

3.Seal around the cleanout plates using the furnace cement provided and apply between base and bottom of sections.

C.APPLY JACKET END ASSEMBLIES

1.Remove necessary knockouts from the Jacket End Panel pieces in carton 12.

2.Attach a Corner Panel Support Bracket (GG-6029) to each Corner Panel using two #10 x 1/2" (13 mm) long sheet metal screws.

3.Attach the four Corner Panels to the Base Ends using 1/4"-20 x 1/2" (13 mm) long machine screws and 1/4" flat washers. The locations are:

Right Front – GG-6015

Left Front – GG-6016

Right Rear – GG-6017

Left Rear – GG-6018

D.211A-04 THROUGH 211A-08 ONLY

1.Apply Front and Rear Panels as follows.

2.Open Jacket Intermediate Section carton, 12A, B, C, D or E, per Table 6.1. Remove necessary knockouts from panels.

3.Insert Front Panel (GG-6023) flange (on right side of panel) under the edge of the Right Front Corner Panel. Place the left edge of the Front Panel over the offset flange of the Left Front Corner Panel. Line up the screw holes and secure with ten #10 x 1/2"

(13 mm) long sheet metal screws.

4.Insert the offset flange of the Upper Rear Panel under the edge of the Left Rear Corner Panel. Place the left edge of the panel over the Right Rear Corner Panel. Line up the holes and secure with ten #10 x 1/2" (13 mm) long sheet metal screws.

5.Apply the Lower Rear Panel using the same procedure and secure with two #10 x 1/2" (13 mm) long sheet metal screws.

6.Install Rear Panel Support Leg (GG-6028) inside the Left Rear Corner Panel. The flanges extend toward the boiler. Line up the holes and secure with three #10 x 1/2" (13 mm) long sheet metal screws.

7.Attach the Lower Rear Panel Guide (GG-6031) to the Rear Base Panel as shown in Figure 6.2.

8.Install the Draft Hood. Work from the left side (facing the front) of the boiler to the right. Apply the Draft Hood Sections in the sequence given in Table 6.2. Attach the Hood sections to the Flue Collector with two #10 x 1/2" (13 mm) long sheet metal screws per collector section.

9.Insert the offset flange of the Jacket Top Panel under the Top Left End Panel. Place the right flange on the Top Right End Panel. The front edge flange goes over the Jacket Front Panel. Line up the holes and secure with #10 x 1/2" (13 mm) long sheet metal screws.

4.Attach an End Panel Cover Plate (GG-6030) to the opening on the Upper Left End Panel if the 6 inch tapping on that end is not used.

5.Attach Upper Left End Panel (GG-6032) to the left end corner panels with five #10 x 1/2" (13 mm) long sheet metal screws.

6.Place Top Left End Panel (GG-6020) over the Corner Panels and Upper Panel with flange pointing downward. Use four #10 x 1/2" (13 mm) long sheet metal screws.

7.Repeat for the Right End.

E.211A-09 AND LARGER ONLY

1.The boilers have multiple intermediate jacket panels.

2.Collect the jacket cartons listed in Table 6.1. When installing the jacket panels, place them on boiler in the order shown in Figure 6.3.

3.Open the cartons in the order listed in Figure 6.3.

4.Install the Jacket Front Panels:

Make sure to slip the Front Panels into the Front Panel Support Brackets (mounted on the base). See Figure 6.2.

Install the first Front Panel with the left edge over the Left Front Corner Panel. Line up the holes and secure with #10 x 1/2" (13 mm) long sheet metal screws.

23

Image 25
Contents Series 211A Table of Contents Follow the Piping Guidelines Using this ManualControls Special Attention BoxesAccessibility Clearances PreinstallationCombustible Construction Clearances AIR for Combustion and VentilationRequired Volume fan = 15 ft Required Volume other =21 ft Input for all appliances in the space. See Btu/hr 22 cm 2 per 2000 W of total ratedWhere Chimney or VentMechanical Combustion Air Supply Combustion Air DuctsVent Sizing Exterior VentsCombined vent breeching Installation Survey Boiler SettingWater Quality and MAKE-UP Boiler Foundation Layout Assemble the Base Base AssemblyCrate Items For 211A-04 through 211A-08 Only Install the Pilot BurnersModel Overall Length Base Front and Back Panel CratesTypical Gas Manifold and Pilot Line Assembly Pilots Total Natural Gas Only Propane Gas Only Model NumberBurners Preparation Place the Boiler SectionsPlacing the Sections Assembling Sections on Base Align Sections Vertically Hydrostatic Test the BoilerDo not tighten yet Install the Flue CollectorBoiler Position Supply Piping Pipe the BoilerReturn Piping Pipe the Boiler Boiler Header End Risers Multiple Boiler InstallationsEqualizers Model SizePiping Multiple Boilers, Typical, Gravity Return Systems Apply Cleanout Cover Plates Install the Jacket & Draft HoodPrepare the Parts Apply Jacket END AssembliesApply Jacket TOP Panels Apply Lower END PanelsApply Plates and Labels Top Panel GG-6024 Carton Contents Sub-Assembly Part Number Quantity Jacket Assembly Sequence Carton Numbers and Locations 13C Install Vent and Bleed Piping Install GAS TrainConnect GAS Piping Connect Pilot GAS TubingTest GAS Supply Piping Install GAS Supply PipingSpecific Gravity Multiply Capacity by Pipe Length 4 Pipe 2 PipeInstall Safety Valves Install LOW Water CUT-OFFS Install Controls and TrimInstall Blowdown Valves Install Pressure ControlsPressure Control Piping Fittings Included with Boiler Standard Float Type COntrol, Model 67PE2 Optional Float Type Pump Control/Low Water Cut-Off, Model Application of 51 Feeders Connect Supply Wiring Wire the BoilerInstall Control Wiring Prepare Remaining ControlsTypical Wiring Standard Controls Low Voltage Gas Valves Typical Wiring Standard Controls 120-Volt Gas Valves Starting the Boiler Check Boiler Controls Clean the BoilerMeter reading. Rate, Btu/Hr = F x H x To Light the Boiler To Shut Down the Boiler Lighting Instructions TypicalPilot Flame Failure Operation & Maintenance Pilot and Burner Flames Placing Boiler in OperationAnnual Maintenance Monthly MaintenanceWeekly Maintenance Daily MaintenanceProblem Possible Cause Suggested Remedy Troubleshooting Service TipsCorrect Piping Boiler Rating Information Boiler Ratings & DimensionsBoiler Ratings & Dimensions Series 211A Steam Boiler Dimensions Chart continues onSeries 211A Steam Boiler Dimensions Description Part Selection Information Stock Code Repair Parts Series 211ABase Front Panel Cover Plate 26 660 mm Wide Base Panel Boiler Assembly Base Assembly Page Series 211A