PB Heat 211A manual Pipe Length 4 Pipe 2 Pipe, Specific Gravity Multiply Capacity by

Page 33

CONNECT GAS PIPING

Table 7.1: Capacity of Gas Supply Pipe in Cubic Feet (Cubic Meters) Per Hour of Natural Gas for 0.3 inch (75 Pa) Drop.

Pipe Length

1-1/4" Pipe

1-1/2" Pipe

2" Pipe

2-1/2" Pipe

3" Pipe

4" Pipe

6" Pipe

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Feet

Meters

Foot3

Meter3

Foot3

Meter3

Foot3

Meter3

Foot3

Meter3

Foot3

Meter3

Foot3

Meter3

Foot3

Meter3

10

3.0

1050

30

1,600

45

3,050

86

4,800

136

8,500

241

17,500

496

44,000

1246

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

20

6.1

730

21

1,100

31

2,100

59

3,300

93

5,900

167

12,000

340

31,000

878

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

30

9.1

590

17

890

25

1,650

47

2,700

76

4,700

133

9,700

275

25,000

708

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

40

12.2

500

14

760

22

1,450

41

2,300

65

4,100

116

8,300

235

22,000

623

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

50

15.2

440

12

670

19

1,270

36

2,000

57

3,600

102

7,400

210

20,000

566

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

60

18.3

400

11

610

17

1,150

33

1,850

52

3,250

92

6,800

193

18,000

510

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

70

21.3

350

10

560

16

1,050

30

1,700

48

3,000

85

6,200

176

17,000

481

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

90

27.4

320

9

490

14

930

26

1,500

42

2,600

74

5,400

153

15,000

425

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

100

30.5

305

9

460

13

870

25

1,400

40

2,500

71

5,100

144

14,000

396

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

150

45.7

250

7

380

11

710

20

1,130

32

2,000

57

4,100

116

11,500

326

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

Above ratings based on natural gas with specific gravity of 0.60 allowing pressure drop of 0.3 inches (75 Pa). No allowance is needed for pipe fittings. Use the following multipliers on above capacities for specific gravity other than 0.60:

Specific Gravity

0.50

0.55

0.60

0.65

0.70

 

 

 

 

 

 

Multiply Capacity by:

1.10

1.04

1.00

.962

.926

 

 

 

 

 

 

31

Image 33
Contents Series 211A Table of Contents Follow the Piping Guidelines Using this ManualControls Special Attention BoxesAccessibility Clearances PreinstallationCombustible Construction Clearances AIR for Combustion and VentilationRequired Volume other = Required Volume fan = 15 ft21 ft Input for all appliances in the space. See Btu/hr 22 cm 2 per 2000 W of total ratedWhere Chimney or VentMechanical Combustion Air Supply Combustion Air DuctsExterior Vents Vent SizingCombined vent breeching Boiler Setting Installation SurveyWater Quality and MAKE-UP Boiler Foundation Layout Base Assembly Assemble the BaseCrate Items For 211A-04 through 211A-08 Only Install the Pilot BurnersModel Overall Length Base Front and Back Panel CratesTypical Gas Manifold and Pilot Line Assembly Total Natural Gas Only Propane Gas Only Model Number PilotsBurners Place the Boiler Sections PreparationPlacing the Sections Assembling Sections on Base Align Sections Vertically Hydrostatic Test the BoilerDo not tighten yet Install the Flue CollectorBoiler Position Pipe the Boiler Supply PipingReturn Piping Pipe the Boiler Boiler Header End Risers Multiple Boiler InstallationsEqualizers Model SizePiping Multiple Boilers, Typical, Gravity Return Systems Apply Cleanout Cover Plates Install the Jacket & Draft HoodPrepare the Parts Apply Jacket END AssembliesApply Lower END Panels Apply Jacket TOP PanelsApply Plates and Labels Top Panel GG-6024 Carton Contents Sub-Assembly Part Number Quantity Jacket Assembly Sequence Carton Numbers and Locations 13C Install Vent and Bleed Piping Install GAS TrainConnect GAS Piping Connect Pilot GAS TubingTest GAS Supply Piping Install GAS Supply PipingSpecific Gravity Multiply Capacity by Pipe Length 4 Pipe 2 PipeInstall Safety Valves Install LOW Water CUT-OFFS Install Controls and TrimInstall Blowdown Valves Install Pressure ControlsPressure Control Piping Fittings Included with Boiler Standard Float Type COntrol, Model 67PE2 Optional Float Type Pump Control/Low Water Cut-Off, Model Application of 51 Feeders Connect Supply Wiring Wire the BoilerInstall Control Wiring Prepare Remaining ControlsTypical Wiring Standard Controls Low Voltage Gas Valves Typical Wiring Standard Controls 120-Volt Gas Valves Starting the Boiler Clean the Boiler Check Boiler ControlsMeter reading. Rate, Btu/Hr = F x H x Lighting Instructions Typical To Light the Boiler To Shut Down the BoilerPilot Flame Failure Operation & Maintenance Pilot and Burner Flames Placing Boiler in OperationAnnual Maintenance Monthly MaintenanceWeekly Maintenance Daily MaintenanceProblem Possible Cause Suggested Remedy Troubleshooting Service TipsCorrect Piping Boiler Rating Information Boiler Ratings & DimensionsBoiler Ratings & Dimensions Series 211A Steam Boiler Dimensions Chart continues onSeries 211A Steam Boiler Dimensions Description Part Selection Information Stock Code Repair Parts Series 211ABase Front Panel Cover Plate 26 660 mm Wide Base Panel Boiler Assembly Base Assembly Page Series 211A