PB Heat
211A
manual
Boiler Assembly
Troubleshooting
Install
Repair Parts Series 211A
Chart continues on
Wire the Boiler
Dimension
Maintenance
Base Assembly
Boiler Setting
Apply Cleanout Cover Plates
Page 56
REPAIR PARTS – SERIES 211A
Figure 15.1: Boiler Assembly
54
Page 55
Page 57
Image 56
Page 55
Page 57
Contents
Series 211A
Table of Contents
Using this Manual
Follow the Piping Guidelines
Controls
Special Attention Boxes
Preinstallation
Accessibility Clearances
Combustible Construction Clearances
AIR for Combustion and Ventilation
21 ft
Required Volume other =
Required Volume fan = 15 ft
Btu/hr 22 cm 2 per 2000 W of total rated
Input for all appliances in the space. See
Chimney or Vent
Where
Mechanical Combustion Air Supply
Combustion Air Ducts
Combined vent breeching
Exterior Vents
Vent Sizing
Water Quality and MAKE-UP
Boiler Setting
Installation Survey
Boiler Foundation Layout
Crate Items
Base Assembly
Assemble the Base
Install the Pilot Burners
For 211A-04 through 211A-08 Only
Base Front and Back Panel Crates
Model Overall Length
Typical Gas Manifold and Pilot Line Assembly
Burners
Total Natural Gas Only Propane Gas Only Model Number
Pilots
Placing the Sections
Place the Boiler Sections
Preparation
Assembling Sections on Base
Hydrostatic Test the Boiler
Align Sections Vertically
Install the Flue Collector
Do not tighten yet
Boiler Position
Return Piping
Pipe the Boiler
Supply Piping
Pipe the Boiler
Multiple Boiler Installations
Boiler Header End Risers
Equalizers
Model Size
Piping Multiple Boilers, Typical, Gravity Return Systems
Install the Jacket & Draft Hood
Apply Cleanout Cover Plates
Prepare the Parts
Apply Jacket END Assemblies
Apply Plates and Labels
Apply Lower END Panels
Apply Jacket TOP Panels
Top Panel GG-6024
Carton Contents Sub-Assembly Part Number Quantity
Jacket Assembly Sequence Carton Numbers and Locations
13C
Install GAS Train
Install Vent and Bleed Piping
Connect GAS Piping
Connect Pilot GAS Tubing
Install GAS Supply Piping
Test GAS Supply Piping
Pipe Length 4 Pipe 2 Pipe
Specific Gravity Multiply Capacity by
Install Controls and Trim
Install Safety Valves Install LOW Water CUT-OFFS
Install Blowdown Valves
Install Pressure Controls
Pressure Control Piping Fittings Included with Boiler
Standard Float Type COntrol, Model 67PE2
Optional Float Type Pump Control/Low Water Cut-Off, Model
Application of 51 Feeders
Wire the Boiler
Connect Supply Wiring
Install Control Wiring
Prepare Remaining Controls
Typical Wiring Standard Controls Low Voltage Gas Valves
Typical Wiring Standard Controls 120-Volt Gas Valves
Starting the Boiler
Meter reading. Rate, Btu/Hr = F x H x
Clean the Boiler
Check Boiler Controls
Pilot Flame Failure
Lighting Instructions Typical
To Light the Boiler To Shut Down the Boiler
Operation & Maintenance
Placing Boiler in Operation
Pilot and Burner Flames
Monthly Maintenance
Annual Maintenance
Weekly Maintenance
Daily Maintenance
Troubleshooting Service Tips
Problem Possible Cause Suggested Remedy
Correct Piping
Boiler Ratings & Dimensions
Boiler Rating Information
Boiler Ratings & Dimensions
Chart continues on
Series 211A Steam Boiler Dimensions
Series 211A Steam Boiler Dimensions
Repair Parts Series 211A
Description Part Selection Information Stock Code
Base Front Panel Cover Plate 26 660 mm Wide Base Panel
Boiler Assembly
Base Assembly
Page
Series 211A
Related pages
All Assembly page
Body Assembly Model 31A Sander for Powermatic 31A
Parts Packed Separately in Carton Assembly / PRE-OPERATION for Poulan 416810
Extended Back Guard Assembly for American Dryer Corp AD-120ES
Assembly Instruction for Impex MS-60
Disassembly for LG Electronics A3UH363FA0, A3UC363FA0, AMNH093D4A0, AMNC093D4A0, AMNH123DEA0, AMNC123DEA0, AMNH093APM0, AMNC093APM0, AMNH123APM0, AMNC123APM0
Assembly for Poulan 411229
Assembly Instructions for Aussie 68R5A9SSS1
Assembly Motor Stepper for Generac 004373-1, 004626-0
Instructions for Assembly for Kettler 07852-690
Control Assembly Parts 310554V for Graco 310554V
How do I maintain my Rotel RCD-1070 CD Player?
Read maintenance tips
Top
Page
Image
Contents