PB Heat 211A manual Troubleshooting Service Tips, Problem Possible Cause Suggested Remedy

Page 48

TROUBLESHOOTING – SERVICE TIPS

13. TROUBLESHOOTING – SERVICE TIPS

Problem

Possible Cause

Suggested Remedy

 

 

 

 

Defective Thermocouple

Replace

 

 

 

 

Heavy Draft Blowing across Pilot

Redirect Air Movement or Eliminate

 

 

 

 

Plugged Pilot Orifice

Replace Orifice

 

 

 

Pilot Outage

 

Check Manual Pilot Valve

 

No Gas

Check Main Gas Shut-Off Valve

 

Check Manual Meter Valve

 

 

 

 

Consult Gas Company

 

 

 

 

Defective Thermopilot Valve

Replace

 

 

 

 

Defective Ignition Control

Replace

 

 

 

 

No Power

Check Power Source with Meter

 

Check Fuses

 

 

 

 

 

 

Defective Gas Valve

Replace

 

 

 

 

Defective Thermocouple

Replace

 

 

 

 

Low Water Level in Boiler

Check for Leaks

Main Gas Valve Will Not Open

or System Causing Low Water Cut-off to Function

Check Feeder (if Supplied)

(Standard Spark-Ignited Pilot System)

 

 

Defective Thermopilot Valve

Replace

 

 

 

 

Defective Ignition Control

Replace

 

 

 

 

High Gas Pressure Switch Open

Check Switch Setting

 

(if Provided)

Check Manifold Gas Pressure

 

 

 

 

Low Gas Pressure Switch Open

Check Switch Setting

 

(if Provided)

Check Manifold Gas Pressure

 

 

 

 

No Power

Check Power Source with Meter

 

Check Fuses

 

 

 

 

 

 

Defective Gas Valve

Replace

 

 

 

 

Relay Locked Out on Safety

Check for Pilot Outage

 

 

 

 

Pilot Out

Relight Pilot

 

(May have defective pilot valve or relay)

 

 

 

 

 

Main Gas Valve Will Not Open

Defective Relay

Replace

(Electronic Standing Pilot System)

Low Water in Boiler

Check for Leaks

 

or System Causing Low Water Cut-off to Function

Check Feeder (if Supplied)

 

 

 

 

Defective Thermopilot Valve(s)

Replace

 

 

 

 

Defective Thermocouple(s)

Replace

 

 

 

 

High Gas Pressure Switch Open

Check Switch Setting

 

(if Provided)

Check Manifold Gas Pressure

 

 

 

 

Low Gas Pressure Switch Open

Check Switch Setting

 

(if Provided)

Check Inlet Gas Pressure

 

 

 

 

Air Adjustment Screws Turned in Too Far

Adjust Screws Out

 

 

 

 

Low Gas Pressure in Manifold

Adjust Main Gas Pressure Regulator

 

(Insufficient Air Injection)

or Check Line Pressure

 

 

 

 

Burner Ports Partially Closed (Rust, Dirt, Lint, etc.)

Replace Burners or Clean Ports

 

 

 

Burner(s) Burning with Yellow Flame

 

Check Size of Combustion Air Openings to

 

Insufficient Air for Combustion

Room, if Undersized, Correct as Required

 

 

Check for Negative Pressure in Boiler Room

 

 

 

 

Oversized Burner Orifice

Install Correct Orifice

 

 

 

 

High Gas Pressure in Manifold

Adjust Main Gas Pressure Regulator

 

 

 

 

Insufficient Draft – Chimney Too Low

Increase Height or Add Induced Draft Fan

 

 

 

 

Insufficient Draft – Chimney Too Small

Replace Chimney or Add Induced Draft Fan

 

 

 

Gas Spillage from

Insufficient Draft – Blockage in Chimney or Vent

Repair Chimney or Vent

 

 

Insufficient Draft – Downdraft Caused by

 

Draft Hood Relief Opening

 

Chimney Location with Respect to

Install Chimney Cap

 

 

Other Buildings, Roofs, etc.

 

 

 

 

 

Negative Pressure in Boiler Room

Remove Exhaust Fan

 

(Due to Exhaust Fan or Duct System)

or Isolate Fan From Boiler Room

 

 

 

 

Insufficient Combustion Air Openings

Provide Correctly Sized Combustion and

 

 

Ventilation Air Openings

46

Image 48
Contents Series 211A Table of Contents Using this Manual Follow the Piping GuidelinesControls Special Attention BoxesPreinstallation Accessibility ClearancesCombustible Construction Clearances AIR for Combustion and VentilationRequired Volume other = Required Volume fan = 15 ft21 ft Btu/hr 22 cm 2 per 2000 W of total rated Input for all appliances in the space. SeeChimney or Vent WhereMechanical Combustion Air Supply Combustion Air DuctsExterior Vents Vent SizingCombined vent breeching Boiler Setting Installation SurveyWater Quality and MAKE-UP Boiler Foundation Layout Base Assembly Assemble the BaseCrate Items Install the Pilot Burners For 211A-04 through 211A-08 OnlyBase Front and Back Panel Crates Model Overall LengthTypical Gas Manifold and Pilot Line Assembly Total Natural Gas Only Propane Gas Only Model Number PilotsBurners Place the Boiler Sections PreparationPlacing the Sections Assembling Sections on Base Hydrostatic Test the Boiler Align Sections VerticallyInstall the Flue Collector Do not tighten yetBoiler Position Pipe the Boiler Supply PipingReturn Piping Pipe the Boiler Multiple Boiler Installations Boiler Header End RisersEqualizers Model SizePiping Multiple Boilers, Typical, Gravity Return Systems Install the Jacket & Draft Hood Apply Cleanout Cover PlatesPrepare the Parts Apply Jacket END AssembliesApply Lower END Panels Apply Jacket TOP PanelsApply Plates and Labels Top Panel GG-6024 Carton Contents Sub-Assembly Part Number Quantity Jacket Assembly Sequence Carton Numbers and Locations 13C Install GAS Train Install Vent and Bleed PipingConnect GAS Piping Connect Pilot GAS TubingInstall GAS Supply Piping Test GAS Supply PipingPipe Length 4 Pipe 2 Pipe Specific Gravity Multiply Capacity byInstall Controls and Trim Install Safety Valves Install LOW Water CUT-OFFSInstall Blowdown Valves Install Pressure ControlsPressure Control Piping Fittings Included with Boiler Standard Float Type COntrol, Model 67PE2 Optional Float Type Pump Control/Low Water Cut-Off, Model Application of 51 Feeders Wire the Boiler Connect Supply WiringInstall Control Wiring Prepare Remaining ControlsTypical Wiring Standard Controls Low Voltage Gas Valves Typical Wiring Standard Controls 120-Volt Gas Valves Starting the Boiler Clean the Boiler Check Boiler ControlsMeter reading. Rate, Btu/Hr = F x H x Lighting Instructions Typical To Light the Boiler To Shut Down the BoilerPilot Flame Failure Operation & Maintenance Placing Boiler in Operation Pilot and Burner FlamesMonthly Maintenance Annual MaintenanceWeekly Maintenance Daily MaintenanceTroubleshooting Service Tips Problem Possible Cause Suggested RemedyCorrect Piping Boiler Ratings & Dimensions Boiler Rating InformationBoiler Ratings & Dimensions Chart continues on Series 211A Steam Boiler DimensionsSeries 211A Steam Boiler Dimensions Repair Parts Series 211A Description Part Selection Information Stock CodeBase Front Panel Cover Plate 26 660 mm Wide Base Panel Boiler Assembly Base Assembly Page Series 211A