PREINSTALLATION

f.After it has been determined that each appliance remaining connected to the common venting system properly vents when tested as outlined above, return doors, windows, exhaust fans, fireplace dampers and any other gas-burning appliance to their previous condition of use.

g.Any improper operation of the common venting system should be corrected so the installation conforms with the current edition of the National Fuel Gas Code, ANSI Z223.1/NFPA 54 and/or CAN/CGA B149, Installation Codes. When resizing any portion of the common venting system, the common venting system should be resized to approach the minimum size as determined using the appropriate tables located in the chapter Sizing of Category I Venting Systems in the current edition of the National Fuel Gas Code, ANSI Z223.1/NFPA 54 and/or CAN/CGA B149, Installation Codes.

E.BOILER SETTING

1.Provide a good, level foundation for the boiler with the minimum dimensions given in Figure 1.9 and Table 1.1. The flooring and structural support system must be suitable for the operating weight of the boiler and any connected piping.

2.Do not operate the boiler until the foundation, if new concrete, has thoroughly cured. The high temperature under the burners could cause major damage to the concrete if it still contains moisture.

WARNING

Do not install this boiler on carpeting or any combustible flooring. A significant fire hazard could result, with potential for property damage, personal injury or death.

3.If the boiler is installed in a penthouse or if wiring of any sort is run underneath the boiler foundation, construct the foundation with provision for airflow underneath between the main floor and the top of the boiler foundation.

a.Concrete block aligned with the openings connected continuously would serve this purpose, for example.

b.If the foundation must be a concrete slab, use an air cell high temperature insulating board, at least 1/2 inch (13 mm) thick, with aluminum backing, aluminum side up. One-half inch (13 mm) Hi Temp millboard with aluminum backing would be acceptable as well. Place the insulating board on the slab inside the base.

F.WATER QUALITY AND MAKE-UP

1.Check the system to make sure there are no leaks or overfilling problems which might cause excessive make-up water to be added. Make-up water causes liming in the boiler and brings in oxygen. Oxygen can cause severe damage to the boiler through oxygen corrosion pitting.

2.Clean the boiler as described in this manual. Poor water quality will cause foaming, priming and overfilling of the system. Too much sediment in the water will cause build-up in the boiler and could result in cracked sections due to overheating.

3.If the condensate return time lag is too long, this boiler may not work correctly with gravity return or with a condensate return unit. Long time lags will cause make-up water to be added to the boiler, resulting in flooding of the boiler, carryover to the system and excessive make-up water addition. You will need to install a boiler feed system to prevent problems in such cases.

4.Do not use chemicals or substances in the boiler or system which contain petroleum or its derivatives. This will damage the boiler seals.

G.INSTALLATION SURVEY

For new and existing installations, a Steam Installation Survey is available from PB Heat. The survey will provide information on how a steam boiler works with your specific system and will provide an overview of steam system operation in general.

You can also use this survey to locate system problems which will have to be corrected. To obtain copies of the Steam Installation Survey, contact your PB Heat representative or download from PeerlessBoilers.com.

Figure 1.9: Foundation Layout

7

Image 9
Contents Series 211A Table of Contents Follow the Piping Guidelines Using this ManualControls Special Attention BoxesAccessibility Clearances PreinstallationCombustible Construction Clearances AIR for Combustion and VentilationRequired Volume other = Required Volume fan = 15 ft21 ft Input for all appliances in the space. See Btu/hr 22 cm 2 per 2000 W of total ratedWhere Chimney or VentMechanical Combustion Air Supply Combustion Air DuctsExterior Vents Vent SizingCombined vent breeching Boiler Setting Installation SurveyWater Quality and MAKE-UP Boiler Foundation Layout Base Assembly Assemble the BaseCrate Items For 211A-04 through 211A-08 Only Install the Pilot BurnersModel Overall Length Base Front and Back Panel CratesTypical Gas Manifold and Pilot Line Assembly Total Natural Gas Only Propane Gas Only Model Number PilotsBurners Place the Boiler Sections PreparationPlacing the Sections Assembling Sections on Base Align Sections Vertically Hydrostatic Test the BoilerDo not tighten yet Install the Flue CollectorBoiler Position Pipe the Boiler Supply PipingReturn Piping Pipe the Boiler Boiler Header End Risers Multiple Boiler InstallationsEqualizers Model SizePiping Multiple Boilers, Typical, Gravity Return Systems Apply Cleanout Cover Plates Install the Jacket & Draft HoodPrepare the Parts Apply Jacket END AssembliesApply Lower END Panels Apply Jacket TOP PanelsApply Plates and Labels Top Panel GG-6024 Carton Contents Sub-Assembly Part Number Quantity Jacket Assembly Sequence Carton Numbers and Locations 13C Install Vent and Bleed Piping Install GAS TrainConnect GAS Piping Connect Pilot GAS TubingTest GAS Supply Piping Install GAS Supply PipingSpecific Gravity Multiply Capacity by Pipe Length 4 Pipe 2 PipeInstall Safety Valves Install LOW Water CUT-OFFS Install Controls and TrimInstall Blowdown Valves Install Pressure ControlsPressure Control Piping Fittings Included with Boiler Standard Float Type COntrol, Model 67PE2 Optional Float Type Pump Control/Low Water Cut-Off, Model Application of 51 Feeders Connect Supply Wiring Wire the BoilerInstall Control Wiring Prepare Remaining ControlsTypical Wiring Standard Controls Low Voltage Gas Valves Typical Wiring Standard Controls 120-Volt Gas Valves Starting the Boiler Clean the Boiler Check Boiler ControlsMeter reading. Rate, Btu/Hr = F x H x Lighting Instructions Typical To Light the Boiler To Shut Down the BoilerPilot Flame Failure Operation & Maintenance Pilot and Burner Flames Placing Boiler in OperationAnnual Maintenance Monthly MaintenanceWeekly Maintenance Daily MaintenanceProblem Possible Cause Suggested Remedy Troubleshooting Service TipsCorrect Piping Boiler Rating Information Boiler Ratings & DimensionsBoiler Ratings & Dimensions Series 211A Steam Boiler Dimensions Chart continues onSeries 211A Steam Boiler Dimensions Description Part Selection Information Stock Code Repair Parts Series 211ABase Front Panel Cover Plate 26 660 mm Wide Base Panel Boiler Assembly Base Assembly Page Series 211A