American Panel AP24BC250-3 Shock Freeze Cycle, Uv Sterilization Cycle, Defrost Cycle, UV cycle

Page 30
4. SHOCK FREEZE CYCLE

AP24BC250-3, AP24BCF300-3, AP40BC350-3, AP40BCF450-3 Manual

To perform a hard chill cycle, follow steps 1 or 2 (above), EXCEPT in step 1.b (above) press

5. UV (STERILIZATION) CYCLE instead of a. To perform a UV cycle remove all food, then press.

4. SHOCK FREEZE CYCLE

To perform a shock freeze cycle, follow steps 1 or 2 (above), EXCEPT in step 1.b (above) press

(“UV LIGHT”) button. instead of b. Press the.

5. UV (STERILIZATION) CYCLE

a. To perform a UV cycle remove all food, then press

OPERATING MODE

 

 

 

 

 

the

(“UV LIGHT”) button.

CHOOSE

 

 

 

 

 

 

OPERATING CYCLE

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

 

03.07.2006

11:43 AM

 

 

 

 

 

b. Press the

("START/STOP") button to start the

UV CYCLE

 

READY TO

 

 

 

 

 

START

 

 

UV cycle.

 

READY TO START

 

 

Blinks

 

 

 

 

 

 

 

 

 

 

 

The display will show briefly:

STARTING CYCLE . . .

Then the display will now show:

03.07.2006

11:43 AM

UV CYCLE

UV TIME

29:59

29:59

Will count down to

00:00

After 30 minutes the display will show: The controller will beep for a few seconds.

03.07.2006 12:13 PM

UV CYCLE

COMPLETE

COMPLETE

Blinks

The operator can now end this cycle by pressing ("START/STOP") button to start the("START/ STOP").

The display will show briefly:

STOPPING CYCLE . . .

Then the display will show:

OPERATING MODE

CHOOSE

OPERATING CYCLE

6. DEFROST CYCLE

29

Image 30
Contents E-mail service@americanpanel.com American Panel CorporationREV. E USER’S MANUALREQUIREMENTS TO BE MET DURING INSTALLATION 8 STEPS CONTROLLER FEATURESINSTALLATION OF REMOTE UNITS INSTALLATION AT THE SAME LEVELMAINTENANCE AND CLEANING PREPARING AND USING THE OPTIONAL PRINTERMAINTENANCE CLEANING THE CONDENSERCONTROLLER FEATURES INTRODUCTIONOPERATING MODES OPERATING CYCLES PRINTER OPTIONALPC CONNECTION OPTIONAL INSTALLATION AT THE SAME LEVEL INSTALLATION OF REMOTE UNITSREQUIREMENTS TO BE MET DURING INSTALLATION 8 STEPS COMPRESSORINSTALLATION AT DIFFERENT LEVELS CONNECTION PIPING FOR REMOTE CONDENSING UNITSDIMENSIONS INSTALLATIONINSTALLATION WARNINGSCONNECTION TO THE REMOTE UNIT VERIFYING CORRECT INSTALLATIONELECTRICAL AND REFRIGERATION SPECIFICATIONS CONDENSATE DRAINAGE CONNECTIONSTARTING & TESTING THE UNIT SPACES AROUND THE CABINETSHOCK FREEZING USING THE HURRICHILL TECHNOLOGYBLAST CHILLING SOFT CHILL CYCLEPANNING AND LOADING PANNINGLOADING CONTROL PANEL FOR MODELS AP24 & AP40 BLAST CHILLERS / SHOCK FREEZERS ON/OFF & START/STOP KEYBOARD KEYSKEY COMBINATIONS PROGRAMMING KEYSPROGRAMMING c. Enter the default password by pressing, in order, theIf the entered password is wrong the display will show 1. INITIAL PROGRAMMINGThe high air alarm temperature should be left at The low air alarm temperature should be left atThe high food alarm temperature should be left at YES for shock freezers AP24BCF300-3, AP40BCF450-3 The low food alarm temperature should be left atThe P.C. baud rate should be left at NO for blast chillers AP24BC250-3, AP40BC350-3 and go to step r2. PROGRAMMING THE CYCLES AUTOMATIC SOFT CYCLE PARAMETERS PROGRAMMING AUTOMATIC HARD CYCLE PARAMETERS PROGRAMMINGthen press AUTOMATIC SHOCK CYCLE PARAMETERS PROGRAMMINGk. To change the temperature, press p. To change the temperature, pressUV LIGHT CYCLE PARAMETERS PROGRAMMING The defrost type must be left AIR FLOW DEFROST CYCLE PARAMETERS PROGRAMMINGHEATED PROBE CYCLE PARAMETERS PROGRAMMING aa. PressThe LED for SOFT will be steady MANUAL SOFT CYCLE PARAMETERS PROGRAMMINGgg. Press hh. To change the temperature, pressMANUAL HARD CYCLE PARAMETERS PROGRAMMING MANUAL SHOCK CYCLE PARAMETERS PROGRAMMING 3. RECIPE NAME PROGRAMMING OPERATION 1. AUTOMATIC MODE - SOFT CHILL2. MANUAL MODE - SOFT CHILL alternating withalternating 3. HARD CHILL CYCLE 6. DEFROST CYCLE 4. SHOCK FREEZE CYCLE5. UV STERILIZATION CYCLE a. To perform a UV cycle remove all food, then pressc. Press the 7. HEATED FOOD PROBEb. Open the door defrost cycle8. PREPARING AND USING THE OPTIONAL PRINTER OTE To stop any cycle before it has finished, press START/STOPPRINTER d. Enter your password, then pressNOTE The optional printer is delivered fully installed 9. TO CLEAR DATAREMOVING A ROLL OF PAPER MAINTENANCELOADING A ROLL OF PAPER OPERATING THE PRINTERMAINTENANCE AND CLEANING CLEANING THE CONDENSERREPLACING THE RIBBON WITH PAPER IN THE PRINTER COMPARTMENT WIRING DIAGRAMSCLEANING DO NOT USE ABRASIVES, SOLVENTSAP24BC250-3, AP24BCF300-3, AP40BC350-3, AP40BCF450-3 Manual AP24BC250-3, AP24BCF300-3, AP40BC350-3, AP40BCF450-3 Manual AP24BC250-3, AP24BCF300-3, AP40BC350-3, AP40BCF450-3 Manual COMPUTER CONNECTION PARTS LIST PART #DESCRIPTION AMERICAN PANEL CORP STANDARD WARRANTYinstalling contractor. It is not covered by this Warranty BLAST CHILLERS / SHOCK FREEZERS ONLYORDERING PRINTER SUPPLIES RIBBON & PAPER