Sterling sse manual For your safety, General

Page 13

Machine-Side Hopper Loaders

2.1. For your safety

2.1.1. General

To prevent injury and/or damage to equipment, observe the following safety rules:

Read these operating instructions carefully before operating for the first time. Contact us should questions arise.

These operating instructions must be kept available at all times at the place of operation of the equipment.

Please note that, for reasons of clarity, not all conceivable cases regarding operation or maintenance of the equipment can be covered in these operating instructions.

Observe all safety instructions and warnings on the equipment.

All work on the equipment is to be carried out by persons whose qualifications are specified in the pertaining chapters of the operating instructions.

Wear proper working clothes while performing any work on the equipment.

The local regulations and requirements pertaining to this equipment must be observed.

Disconnect electrical components from the main power supply before work is carried out on these components

Compile detailed operating instructions based on these operating instructions for the sequence of procedures to be carried out on this equipment.

Please note that sound levels exceeding 85 db(A) may in the long term damage your health. Use appropriate ear protection to prevent hearing impairment.

2-2 Safety instructions

Image 13
Contents Operating Instructions Machine-Side Hopper Loader SSE Series Machine-Side Hopper Loaders Iii Machine-Side Hopper Loaders Parts and Service Department Table of Contents Accessories 11-1 Electrical manual 12-1 General instructions Machine-Side Hopper Loaders Legal basis Explanations and informationFields of applications Page Safety instructions General For your safetyAssembly Operation MaintenanceFor the operating safety of the equipment Page Transport, assembly and storage Transport and packing AssemblyStorage Assembly instructions Liter model UnpackingDump valve and sensor Installing the dump valve sensorAttaching the pickup wand Mounting MountingMounting onto a machine hopper Mounting on the processing machineMounting onto DT 30 dosing station Mounting onto mixing hoppers with lateral inletCompressed air connection Electrical connectionX7, ZKW Installation of the optional proportioning valveConnecting Material Lines Functional description Controller Sequence of operationOperation Checking the flexible hose Switching on the unitSetting the conveying time Setting the purge time optional Initial operation Switching off the unitPage Troubleshooting Alarms Maintenance Machine-Side Hopper Loaders Maintenance intervals Changing the sealing ring of the outlet flap Servicing the loaderAdjusting the dump valve sensor Cleaning the unit Order numbers Filter cloth Wire cloth Replacing carbon brushes at the motor InstallationMachine-Side Hopper Loaders Disposal Instructions Taking out of service, dismantling, disposalTechnical data Specifications Liter model Brushless motor Loader Capacity Dimension Sheet Liter model Liter brushless model Spare parts list Parts breakdown, brush-type motor 10.2.1 V, 50 Hz Parts lists, 2-liter model10.2.2 V, 60 Hz 10.2.4 V, 60 Hz with active cleaning 10.2.3 V, 50 Hz with active cleaning10.3.1 V, 50 Hz V66372 Parts list, 5-liter modelPos. Order no. Designation 10.3.2 V, 60 Hz V66378US10.3.4 V, 60 Hz with active cleaning 10.3.3 V, 50 Hz with active cleaningParts breakdown and list, 5-liter model with brushless motor 10.5 V, 50 Hz Accessories Page Electrical manual Page Page Page Page Page Page Page Page Page Quick Start Guide Setting the loader convey time