Sterling sse manual Attaching the pickup wand

Page 23

Machine-Side Hopper Loaders

4.3. Attaching the pickup wand

Use the following procedure to attach the pickup wand:

1.The pickup wand must be connected to flexible hose to allow sufficient movement. The length of the hose should not exceed 10 feet (3 meters). Push the free pipe end approximately 1.5” to 2” (4-5 cm) into the hose. Use a hose clamp to secure the connection. The flex hose should not cover the aeration holes on the pickup wand.

2.Slide the flexible hose onto the material inlet. Use the hose clamps supplied to secure the flex hose.

The pickup wand needs no adjustment for most applications. Insert it into the material to be conveyed and turn the loader on. Some applications require a more defined air-to- material ratio.

The pickup wand can be angled up to approximately 45 degrees in either direction to the vertical. Additional fastening is not required.

When conveying from the bottom of storage containers (silos, surge bins, blender bins, etc.), a suction box is required.

4-4 Assembly instructions

Image 23
Contents Operating Instructions Machine-Side Hopper Loader SSE Series Machine-Side Hopper Loaders Iii Machine-Side Hopper Loaders Parts and Service Department Table of Contents Accessories 11-1 Electrical manual 12-1 General instructions Machine-Side Hopper Loaders Fields of applications Explanations and informationLegal basis Page Safety instructions General For your safetyAssembly Operation MaintenanceFor the operating safety of the equipment Page Transport, assembly and storage Storage AssemblyTransport and packing Assembly instructions Liter model UnpackingDump valve and sensor Installing the dump valve sensorAttaching the pickup wand Mounting MountingMounting onto a machine hopper Mounting on the processing machineMounting onto DT 30 dosing station Mounting onto mixing hoppers with lateral inletCompressed air connection Electrical connectionX7, ZKW Installation of the optional proportioning valveConnecting Material Lines Functional description Controller Sequence of operationOperation Checking the flexible hose Switching on the unitSetting the conveying time Setting the purge time optional Initial operation Switching off the unitPage Troubleshooting Alarms Maintenance Machine-Side Hopper Loaders Maintenance intervals Changing the sealing ring of the outlet flap Servicing the loaderAdjusting the dump valve sensor Cleaning the unit Order numbers Filter cloth Wire cloth Replacing carbon brushes at the motor InstallationMachine-Side Hopper Loaders Disposal Instructions Taking out of service, dismantling, disposalTechnical data Specifications Liter model Brushless motor Loader Capacity Dimension Sheet Liter model Liter brushless model Spare parts list Parts breakdown, brush-type motor 10.2.1 V, 50 Hz Parts lists, 2-liter model10.2.2 V, 60 Hz 10.2.4 V, 60 Hz with active cleaning 10.2.3 V, 50 Hz with active cleaning10.3.1 V, 50 Hz V66372 Parts list, 5-liter modelPos. Order no. Designation 10.3.2 V, 60 Hz V66378US10.3.4 V, 60 Hz with active cleaning 10.3.3 V, 50 Hz with active cleaningParts breakdown and list, 5-liter model with brushless motor 10.5 V, 50 Hz Accessories Page Electrical manual Page Page Page Page Page Page Page Page Page Quick Start Guide Setting the loader convey time