Machine-Side Hopper Loaders

5.1. Sequence of operation

The sequence of operation is as follows:

1.Plug in the machine and move the on/off switch to the “on” position

2.All LEDs on the controller blink, and the software version is displayed on the screen.

3.A 2-second blowback pulse cleans the filter. During blowback, the screen displays “A2.”

4.The motor starts, and conveying begins. The screen displays a countdown of the conveying time. Conveying time can be set for 1-99 seconds.

5.If the optional purge valve is installed, line purging begins, and the screen displays a countdown of purge time. Purge time can be set for 0-99 seconds.

6.The motor shuts off for 8 seconds while material dumps. The screen displays “L8.” The 8-second dump time is a fixed setting and is not adjustable.

7.The controller checks for demand, and if material is needed, the cycle starts over from step 3.

5.2.Controller

3LEDs indicate the respective modes of operation: blowback, conveying, purging, and dumping.

Blowback

Conveyin

Purging

Dumping

Blowback Icon

Conveying Icon

Purging Icon

Change-over Key Arrow Key

Figure 11: Controller

5-2 Functional description

Image 31
Contents Operating Instructions Machine-Side Hopper Loader SSE Series Machine-Side Hopper Loaders Iii Machine-Side Hopper Loaders Parts and Service Department Table of Contents Accessories 11-1 Electrical manual 12-1 General instructions Machine-Side Hopper Loaders Legal basis Explanations and informationFields of applications Page Safety instructions General For your safetyAssembly Operation MaintenanceFor the operating safety of the equipment Page Transport, assembly and storage Transport and packing AssemblyStorage Assembly instructions Liter model UnpackingDump valve and sensor Installing the dump valve sensorAttaching the pickup wand Mounting MountingMounting onto a machine hopper Mounting on the processing machineMounting onto DT 30 dosing station Mounting onto mixing hoppers with lateral inletCompressed air connection Electrical connectionX7, ZKW Installation of the optional proportioning valveConnecting Material Lines Functional description Controller Sequence of operationOperation Checking the flexible hose Switching on the unitSetting the conveying time Setting the purge time optional Initial operation Switching off the unitPage Troubleshooting Alarms Maintenance Machine-Side Hopper Loaders Maintenance intervals Changing the sealing ring of the outlet flap Servicing the loaderAdjusting the dump valve sensor Cleaning the unit Order numbers Filter cloth Wire cloth Replacing carbon brushes at the motor InstallationMachine-Side Hopper Loaders Disposal Instructions Taking out of service, dismantling, disposalTechnical data Specifications Liter model Brushless motor Loader Capacity Dimension Sheet Liter model Liter brushless model Spare parts list Parts breakdown, brush-type motor 10.2.1 V, 50 Hz Parts lists, 2-liter model10.2.2 V, 60 Hz 10.2.4 V, 60 Hz with active cleaning 10.2.3 V, 50 Hz with active cleaning10.3.1 V, 50 Hz V66372 Parts list, 5-liter modelPos. Order no. Designation 10.3.2 V, 60 Hz V66378US10.3.4 V, 60 Hz with active cleaning 10.3.3 V, 50 Hz with active cleaningParts breakdown and list, 5-liter model with brushless motor 10.5 V, 50 Hz Accessories Page Electrical manual Page Page Page Page Page Page Page Page Page Quick Start Guide Setting the loader convey time