5.1. Sequence of operation
The sequence of operation is as follows:
1.Plug in the machine and move the on/off switch to the “on” position
2.All LEDs on the controller blink, and the software version is displayed on the screen.
3.A
4.The motor starts, and conveying begins. The screen displays a countdown of the conveying time. Conveying time can be set for
5.If the optional purge valve is installed, line purging begins, and the screen displays a countdown of purge time. Purge time can be set for
6.The motor shuts off for 8 seconds while material dumps. The screen displays “L8.” The
7.The controller checks for demand, and if material is needed, the cycle starts over from step 3.
5.2.Controller
3LEDs indicate the respective modes of operation: blowback, conveying, purging, and dumping.
Blowback | Conveyin | Purging | Dumping |
Blowback Icon
Conveying Icon
Purging Icon