Boom Unit | |
MACHINE CONTROLS | |
Cable Controlled Models Only | |
Lever Functions | |
Rotor | |
BREAKAWAY | |
Powered Slew | |
WIRE TRAP | |
Rotor Operating Speed | |
Forward Speed | |
High Voltage Cables | |
Hedge Cutting Procedure | |
DRIVING THE TRACTOR AND IMPLEMENT | |
Starting the Tractor | |
Brake and Differential Lock Setting | |
Driving the Tractor and Boom | |
OPERATING THE TRACTOR AND IMPLEMENT | |
Foreign Debris Hazards | |
Bystanders/Passersby Precautions | |
Engaging the Power Take Off (PTO) | |
Operating Speed and Ground Speed | |
Operating the Mower | |
Operating the Attached Mower Heads | |
Shutting Down the Attached Head | |
TRACTOR, BOOM, AND ATTACHED HEAD STORAGE | |
TRANSPORTING THE TRACTOR AND IMPLEMENT | |
TRANSPORT | |
TRANSPORT | |
Transporting on Public Roadways | |
Hauling the Tractor and Implement | |
TROUBLESHOOTING GUIDE | |
MAINTENANCE SECTION | |
LUBRICATION | |
General | |
PTO SHAFT INSPECTION | |
PTO SHAFT LUBRICATION | |
HYDRAULIC SYSTEM | |
Oil Supply | |
Filtration Maintenance | |
HYDRAULIC HOSES | |
Hose Replacement | |
Hose Warranty | |
FLAIL HEAD | |
CABLES | |
PTO GEARBOX | |
STORAGE | |
PROPER TORQUE VALUES FOR FASTENERS |