3Com 3C16895 7-slot Chassis manual Power Cord, Back of the PoE Rack, Front Panel of the PoE Rack

Models: 3C16894 4-slot Chassis 3C16897 8-slot DC Chassis 3C16895 7-slot Chassis 3C16896 8 slot AC Chassis

1 80
Download 80 pages 5.46 Kb
Page 44
Image 44
Power Cord

44CHAPTER 2: INSTALLING THE SWITCH 7750

Connecting the PoE Follow these steps to connect the power cord from the PoE rack:

Power Cord

1Loosen the mounting screw of the PoE terminal block on the rear panel of the switch.

2Insert the -48V OT terminal of the DC power cord to the NEG (-) terminal of the switch and fasten the mounting screw; insert the other end to the NEG (-) terminal of the external PoE power supply. See Figure 34 for a detailed view.

Figure 34 Back of the PoE Rack

1 PoE external power input: NEG (-)

2 (+) PoE external power input: NEG (+)

3 COM port (external power monitor)

3Insert the GND OT terminal of the DC power cord to the RTN (+) terminal of the switch and fasten the mounting screw; insert the other end to the NEG (-) terminal of the site power.

Figure 35 Front Panel of the PoE Rack

1 AC input socket

2 DC output terminal: NEG (-)

3 DC output terminal: RTN (+)

4 RS232 serial port

4Insert the PGND OT terminal of the DC power cord to the grounding screw of the switch and fasten the mounting screw; insert the other end to the grounding bar for the switch.

For detailed instructions on how to install the PoE rack, see the Switch 7750 PoE Rack Installation Guide.

Page 44
Image 44
3Com 3C16895 7-slot Chassis, 3C16894 4-slot Chassis manual Power Cord, Back of the PoE Rack, Front Panel of the PoE Rack