3Com 3C16894 4-slot Chassis, 3C16895 7-slot Chassis Installing The Switch, Preparing to Install

Models: 3C16894 4-slot Chassis 3C16897 8-slot DC Chassis 3C16895 7-slot Chassis 3C16896 8 slot AC Chassis

1 80
Download 80 pages 5.46 Kb
Page 37
Image 37
INSTALLING THE SWITCH 7750

2

INSTALLING THE SWITCH 7750

The following sections describe how to prepare and install the components of the Switch 7750:

Preparing to Install

General Site Requirements

Installation Checklist

Installing the Chassis

Installing the Cabling Rack

Installing a Module

Installing a Submodule

Connecting the Ground Wire

Connecting and Configuring Power

Installing the Fan Assembly

Installing Cables

Connecting Module Cables

Post-installation Checklist

WARNING: Only trained and qualified personnel should install and maintain 3Com products.

Preparing to Install

General Safety

Recommendations

This section provides guidelines for preparing your site and switch for installation.

Before installing your switch, note the following safety recommendations:

Switch off the power supply before connecting the cables.

Keep the switch away from heat sources.

To ensure normal heat dissipation, do not stack switches.

Do not keep the switch in a damp place, and prevent liquid from getting into the switch.

Ensure that the neutral point of the power is grounded properly, to avoid personal injury.

Ensure that the power is off before plugging or unplugging the modules and cables of the switch.

Before moving the chassis, disconnect all the power cords and external cables.

To avoid damage to the switch, connect all the cables correctly. Never connect telephone cables (including the ISDN lines) to the console or AUX port.

Page 37
Image 37
3Com 3C16894 4-slot Chassis manual Installing The Switch, Preparing to Install, General Safety Recommendations