CONTENTS
INSTALLATION
Safety Notices
General Information
Contents List & Part Identification Important Notices
Statutory Requirements
Certification
Technical Data
Gas Fire Dimensions
Installing The Stove
Preparation of the stove
Stove Location
Shelf Clearances
Flue System
Fitting The Flue Spigot And Blanking Plate Rear / Top Flue Options
Connecting The Gas Supply
Pressure Test Sequence
Fitting & Arranging The Coals
Fitting & Arranging The Logs NG
Fitting & Arranging The Logs LPG
Installation of Remote Control System Commissioning The Stove
Fire Testing
Installation Check List
SERVICING
3 |
|
Replacement Of The Glass Frame | |
| |
Burner & Valve Assembly Removal | 26 |
5 |
|
Annual Service | 27 |
6 |
|
Cleaning Outer Surfaces | 27 |
6 |
|
Fault Diagnosis | 28 |
6 |
|
Annual Service Record | 29 |
7 |
|
7 | USER INSTRUCTIONS |
|
7 | Lighting & Controlling The Fire | |
| ||
8 | Cleaning Outer Surfaces | 33 |
| ||
8 | Operation of Remote Control | |
| ||
9 | Important Notices | 38 |
| ||
10 | Statutory Requirements | 38 |
| ||
11 | Certification | 38 |
| ||
Shelf Clearances | 39 | |
| ||
13 | SPARE PARTS |
|
13 |
| |
|
| |
General Components | ||
|
| |
Options & Accessories | 43 | |
|
| |
GUARANTEE | 44 | |
|
| |
Final Factory Checklist | 46 | |
|
|
22
24
2 | Aarrow Sherborne GSL CF |