ACER H233H

17

 

 

 

 

Go to cover page

Assemble the stand upper side to the rear cover

Stick POP label on the correct position the same

S20 through the way of screwing 4 screws till both

S23 as below photo

units firmly attached.

 

 

(No1~4 Screw Size=M4x10; Torque=12+/-

 

 

KGFxCM).

 

 

 

 

 

 

 

 

 

 

 

 

21

34

Assemble the hinge cover into both two sides.

S21

Take a LDPE+EPE bag to cover the LCD

S24 monitor.

Stick a screen card on the front bezel with two

S22 tapes.

Take two cushion foams; one is held the top side

S25 of LCD monitor, and another is held the bottom side.

Page 18
Image 18
Acer RB23WABAS service manual S21