ADCP-75-210 • Issue 1 • March 2007

RAIN

SHIELD

RIGHT

UTILITY

POLE

RAN

CABINET

POLE MOUNT

BRACKET

RAIN

SHIELD

LEFT

21345-A

Figure 27. Pole Mount Components

2.6Installing a RAN Cabinet on a Concrete Pad

This section contains the procedures for installing the RAN on a concrete pad.

Choose an installation site that conforms to all local codes. Obtain all required permits prior to starting installation. Situate the concrete pad along the trench that was used for routing the OSP fiber cables for the system.

Page 39

© 2007, ADC Telecommunications, Inc.