This chapter provides test procedures for checking the operation of Agilent Series 668xA power supplies. The required test equipment is specified and sample performance test record sheets are included. Instructions are given for performing the tests either from the front panel or from a controller over the GPIB.
Tests
Two types of procedures are provided: Operation Verification tests and Performance tests.
Type of Test | Purpose |
Operation Verification | These tests do not check all parameters, but comprise a short procedure to verify that the power |
| supply is performing properly. |
Performance | These tests verify all the Specifications (not Supplementary Characteristics) listed in Table |
| of the Power Supply Operating Manual. |
If you encounter failures or
Note | The power supply must pass the selftest at |
| power supply fails selftest, go to Chapter 3. |
Test Equipment Required
List of Equipment
Table
Current-Monitoring Resistor