Operation Verification Tests
Table
Table 2-3. Operation Verification Tests
| Test | Refer To |
|
|
|
1 | Power Supply Operating Manual | |
2 | Voltage Programming and Readback Accuracy | Table |
3 | Current Programming and Readback Accuracy | Table |
|
|
|
Note: Record the results of Tests 2 and 3 in the appropriate Performance Test Record sheets
Performance Tests
Performance tests check all the specifications of the power supply. The tests are grouped into
Constant Voltage (CV) Tests
Test Setup
Connect your dc voltmeter leads to only +S and
Test Procedures
Perform the test procedures in Table
•Voltage Programming and Readback Accuracy
•CV Load Effect
•CV Source Effect
•CV Noise (PARD)
•Transient Recovery Time
Note | The tests are independent and may be performed in any order. |