
ASSEMBLY
ASSEMBLY
•.Fit the machine to top link (Optional Top Link available).
•Raise machine on tractor linkage until the tractors PTO and the machines gearbox stub shaft are approximately in line.
The four levers of machine controls
must be operated from the tractor seat. During this operation ensure no one is standing on or among the linkage arms or bars. Set tractor hydraulics to position control. Never allow anyone below the frame unless it is securely blocked up.
1900 07/11 | Assembly Section |
© 2011 Alamo Group Inc.